27-27 Ericsson Street, Queens, NY 11369 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 27-27 Ericsson Street, Queens, NY 11369 and source-listed date December 22, 2026. Recorded concerns include site safety / construction operations, jobsite fire extinguishers, construction fence / site protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsJobsite fire extinguishersConstruction fence / site protection
Verified premises, hearing and enforcement snapshot
Verified premises address
27-27 Ericsson Street, Queens, NY 11369
Borough
Queens
BIN
4041425
BBL
4016630058
Source summonses
6
Hearing dates in source
December 22, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 27-27 ERICSSON STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 27-27 Ericsson Street, Queens, NY 11369?
The uploaded record lists 6 summonses, including 039560584L (site safety / construction operations), 039560589K (site safety / construction operations), 039560594P (jobsite fire extinguishers), 039560598M (construction fence / site protection) and additional tickets. The source-listed hearing date: December 22, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 27-27 Ericsson Street, Queens, NY 11369
The verified property matching links 6 distinct summonses to 27-27 Ericsson Street, Queens, NY 11369. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Site safety / construction operations (4): source summons 039560584L, 039560589K, 039560649N, 039560596Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fence / site protection (1): source summons 039560598M. Check this charge separately, even when its documents can be gathered with other property records.
Jobsite fire extinguishers (1): source summons 039560594P. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 6 summonses list October 15, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Site safety / construction operations — ECB/OATH summons 39560584L
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED: ACTIVE DEMOLITION WORK UPON INSPECTION WAS REQUIRED SSP, DEMOLITION DRAWINGS, PRE DEMOLITION SURVEY,VIBRATION & OPTICAL MONITORING CONTRARY TO BUILDING CODE . STOP ALL DEMOLITION WORK IMMEDIATELY PRO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 1
Source violation type
Site Safety
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED: ACTIVE DEMOLITION WORK UPON INSPECTION WAS REQUIRED SSP, DEMOLITION DRAWINGS, PRE DEMOLITION SURVEY,VIBRATION & OPTICAL MONITORING CONTRARY TO BU…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560584L.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560584L, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED AT TIME OF INSPECTION DEMOLITION DEBRIS ON SITE, ROFFING MATERIAL UNDER DEBRIS MATERIAL WICH WAS SUPPOSED TO BE REMOVED AND DELIVER AS FIRST STEP ON DEMOLITION WORK CREATING HAZARDS CONDITIONS FOR FIRS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED AT TIME OF INSPECTION DEMOLITION DEBRIS ON SITE, ROFFING MATERIAL UNDER DEBRIS MATERIAL WICH WAS SUPPOSED TO BE REMOVED AND DELIVER AS FIRST STEP…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560589K.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560589K, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The inspector alleges absent, expired, inaccessible or otherwise deficient portable fire extinguishers at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
BC3301.1.2 & BC3303.7.2 OBSERVED: ACTIVE SITE ,UPON INSPECTION NOTED MISSING FIRE EXTINGUISHERS CREATING HAZARDS CONDITIONS WITH FAMABLE MATERIALS ON FLOOR LIKE WOODEN CHIPS AND CONTRARY TO NYC FIRE CODE B2N6
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2N6
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$625.00
Balance field in extract
$625.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Check the actual site locations, number, condition, inspection tags and accessibility of extinguishers on the inspection date. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC3301.1.2 & BC3303.7.2 OBSERVED: ACTIVE SITE ,UPON INSPECTION NOTED MISSING FIRE EXTINGUISHERS CREATING HAZARDS CONDITIONS WITH FAMABLE MATERIALS ON FLOOR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560594P.
Whether the cited extinguishers were present and properly inspected at the time alleged
Whether the inspector identified the correct site or phase of work
Whether contemporaneous extinguisher service or inspection records document compliance
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Supply, inspect or replace required fire extinguishers promptly and maintain accessible placement.
Retain service tags, logs and dated post-correction photos; verify whether formal DOB certification or OATH hearing response is required.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated extinguisher location photographs and inspection tags
service vendor logs, receipts and replacement invoices
site fire-protection plan and daily inspection records
original summons and photos attached by inspector
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560594P, Building Violation LLC can scope site fire-extinguisher compliance research and hearing-evidence coordination after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure, electrical installation.
Inspector narrative as preserved in source data
OBSERVED: ACTIVE DEMOLITION SITE UPON INSPECTION NOTED MISSING PROJECT INFORMATION PANEL ON FENCE EXP 1 CONTRARY TO NYC BUILDING CODE ./ PROVIDE PROJECT INFORMATION PANEL
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED: ACTIVE DEMOLITION SITE UPON INSPECTION NOTED MISSING PROJECT INFORMATION PANEL ON FENCE EXP 1 CONTRARY TO NYC BUILDING CODE ./ PROVIDE PROJECT IN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560598M.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
site-fence photos, dimensions and inspection log
licensed electrician report and electrical filing history
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560598M, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED: ACTIVE DEMOLITION WORK CS ASIF MOHAMMED FAILED TO PERFORM DUTIES ., NOTED ON MULTIPLE VIO ISSUED FOR HOUSEKEEPING, FIRE EXTINGUISHERS, NO PROJECT INFORMATION PANEL, NO SANITARY FACILITY, NEITHER SSP,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2G5 — BC 3301.13.7 THROUGH BC 3301.13.13 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.
Issue date
October 15, 2026
Service date
October 16, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED: ACTIVE DEMOLITION WORK CS ASIF MOHAMMED FAILED TO PERFORM DUTIES ., NOTED ON MULTIPLE VIO ISSUED FOR HOUSEKEEPING, FIRE EXTINGUISHERS, NO PROJECT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560649N.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560649N, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
BC3303.2.4OBSERVED; ACTIVE DEMOLITION WORK IN PROGRESS UPON INSPECTION WAS NOTED NO SANITARY FACILITIES ON SITE CONTRARY TO BUILDING CODE /PROVIDE SANITARY FACILITIES
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 27-27 Ericsson Street, Queens, NY 11369
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC3303.2.4OBSERVED; ACTIVE DEMOLITION WORK IN PROGRESS UPON INSPECTION WAS NOTED NO SANITARY FACILITIES ON SITE CONTRARY TO BUILDING CODE /PROVIDE SANITARY…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560596Z.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560596Z, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 27-27 Ericsson Street, Queens, NY 11369 — not just the summons number
For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (4 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
Jobsite fire extinguishers (1 source summons): Site fire-extinguisher compliance research and hearing-evidence coordination.
Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 22, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.