NYC DOB / ECB / OATH hearings · verified property resolution

275 Pleasant Avenue, Manhattan, NY 10029 — Construction fence / site protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 275 Pleasant Avenue, Manhattan, NY 10029 and source-listed dates December 3, 2026, December 31, 2026. Recorded concerns include construction fence / site protection, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Construction fence / site protectionStop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
275 Pleasant Avenue, Manhattan, NY 10029
Borough
Manhattan
BIN
1811290
BBL
1017080025
Source summonses
2
Hearing dates in source
December 3, 2026, December 31, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 275 Pleasant Avenue, Manhattan, NY 10029?

The uploaded record lists 2 summonses, including 035730815N (construction fence / site protection), 039209307P (stop-work order / continued work). The source-listed hearing dates: December 3, 2026, December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35730815N
035730815N
8:30 AM
CLASS - 2Construction fence / site protectionPENDING
39209307P
039209307P
8:30 AM
CLASS - 2Stop-work order / continued workPENDING

How the 2 recorded summonses relate at 275 Pleasant Avenue, Manhattan, NY 10029

The verified property matching links 2 distinct summonses to 275 Pleasant Avenue, Manhattan, NY 10029. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fence / site protection (1): source summons 035730815N. Check this charge separately, even when its documents can be gathered with other property records.

Stop-work order / continued work (1): source summons 039209307P. Check this charge separately, even when its documents can be gathered with other property records.

More than one source-listed hearing date: December 3, 2026, December 31, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fence / site protection — ECB/OATH summons 35730815N

Normalized ten-character lookup: 035730815N (infraction 207)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.

Inspector narrative as preserved in source data — potentially incomplete

TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON-SITE EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION OF A CONSTRUCTION SITE OF A PROPOSED 6 STORY NEW BUILDING WAS CLOSED. OBSERVED CONSTRUCTION PLYWOOD FENCE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
September 28, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 275 Pleasant Avenue, Manhattan, NY 10029

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON-SITE EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION OF A CONSTRUCTION SITE OF A PROPOSED 6 STORY NEW B…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035730815N.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035730815N, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 275 Pleasant Avenue, Manhattan, NY 10029
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39209307P

Normalized ten-character lookup: 039209307P (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: structural framing.

Inspector narrative as preserved in source data — potentially incomplete

FULL STOP WORK ORDER ISSUED. STRUCTURAL AND FOUNDATION PERMIT# M01328928 BEING FILED IN RELATION TO NB PERMIT#122132101, WHICH HAS BEEN WITHOUT A VALID PERMIT SINCE 12/12/25, AND NOTICE TO REVOKE NB PERMIT#1221

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 26, 2026
Service date
October 26, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 275 Pleasant Avenue, Manhattan, NY 10029

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “FULL STOP WORK ORDER ISSUED. STRUCTURAL AND FOUNDATION PERMIT# M01328928 BEING FILED IN RELATION TO NB PERMIT#122132101, WHICH HAS BEEN WITHOUT A VALID PER…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039209307P.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039209307P, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 275 Pleasant Avenue, Manhattan, NY 10029
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 275 Pleasant Avenue, Manhattan, NY 10029 — not just the summons number

For this property, start with construction fence / site protection and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 31, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.