NYC DOB / ECB / OATH hearings · verified property resolution

2960 Brighton 4 Street, Brooklyn, NY 11235 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 8 DOB/ECB/OATH summonses with 2960 Brighton 4 Street, Brooklyn, NY 11235 and source-listed dates December 8, 2026, December 14, 2026. Recorded concerns include site safety / construction operations, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsWork contrary to approved plans

Verified premises, hearing and enforcement snapshot

Verified premises address
2960 Brighton 4 Street, Brooklyn, NY 11235
Borough
Brooklyn
BIN
3421358
BBL
3086630277
Source summonses
8
Hearing dates in source
December 8, 2026, December 14, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 2960 BRIGHTON 4 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: 1 default-status record(s) in the source; one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 2960 Brighton 4 Street, Brooklyn, NY 11235?

The uploaded record lists 8 summonses, including 039091660P (site safety / construction operations), 039095078H (site safety / construction operations), 039100261J (site safety / construction operations), 039103432Z (site safety / construction operations) and additional tickets. The source-listed hearing dates: December 8, 2026, December 14, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39091660P
039091660P
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39095078H
039095078H
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39100261J
039100261J
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39103432Z
039103432Z
10:30 AM
CLASS - 2Site safety / construction operationsPENDING
39531035X
039531035X
10:30 AM
CLASS - 1Site safety / construction operationsPENDING
39531036H
039531036H
10:30 AM
CLASS - 1Work contrary to approved plansPENDING
39531037J
039531037J
10:30 AM
CLASS - 1Site safety / construction operationsPENDING
39547480K
039547480K
9:00 AM
CLASS - 1Work contrary to approved plansDEFAULT

How the 8 recorded summonses relate at 2960 Brighton 4 Street, Brooklyn, NY 11235

The verified property matching links 8 distinct summonses to 2960 Brighton 4 Street, Brooklyn, NY 11235. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (6): source summons 039091660P, 039095078H, 039100261J, 039103432Z, 039531035X, 039531037J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work contrary to approved plans (2): source summons 039531036H, 039547480K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 3 summonses list August 1, 2024 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 8, 2026, December 14, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Mixed procedural statuses: DEFAULT: 1; PENDING: 7. Confirm the present status and decision for each ticket before preparing one combined response.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39091660P

Normalized ten-character lookup: 039091660P (infraction 210)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

NO EN DRAWING AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 210 — 28-104.2.2 FAIL TO PROVIDE APPRV/ACCEPTED PLANS ST JOB SITE AT TIME OF INSP
Issue date
August 2, 2023
Service date
August 2, 2023
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$3,125.00
Balance field in extract
$3,125.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “NO EN DRAWING AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039091660P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039091660P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39095078H

Normalized ten-character lookup: 039095078H (infraction 210)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

NO EN DRAWING AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 210 — 28-104.2.2 FAIL TO PROVIDE APPRV/ACCEPTED PLANS ST JOB SITE AT TIME OF INSP
Issue date
September 18, 2023
Service date
September 18, 2023
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$3,125.00
Balance field in extract
$3,125.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “NO EN DRAWING AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039095078H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039095078H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39100261J

Normalized ten-character lookup: 039100261J (infraction 210)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

NO EN DRAWING AND COM/CHECK APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/CODES/ENERG

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 210 — 28-104.2.2 FAIL TO PROVIDE APPRV/ACCEPTED PLANS ST JOB SITE AT TIME OF INSP
Issue date
November 29, 2023
Service date
November 29, 2023
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$3,125.00
Balance field in extract
$3,125.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “NO EN DRAWING AND COM/CHECK APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLEAS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039100261J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039100261J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39103432Z

Normalized ten-character lookup: 039103432Z (infraction 210)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

NO NEW EN DRAWING,COM/CHECK AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTION DOCUMENTS; PLEASE GO TO HTTPS://WWW1.NYC.GOV/

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 210 — 28-104.2.2 FAIL TO PROVIDE APPRV/ACCEPTED PLANS ST JOB SITE AT TIME OF INSP
Issue date
January 12, 2024
Service date
January 12, 2024
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$3,125.00
Balance field in extract
$3,125.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “NO NEW EN DRAWING,COM/CHECK AND ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CON…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039103432Z.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039103432Z, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 5 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39531035X

Normalized ten-character lookup: 039531035X (infraction 181)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: stairs or landings.

Inspector narrative as preserved in source data — potentially incomplete

DURING INSPECTION OF A PROPOSED 12 STORY BUILDING, I OBSERVED THAT THERE WAS DEBRIS THROUGHOUT THE SITE. THERE WAS MATERIAL IN THE WALKWAY ON THE FLOOR AND IN THE STAIRCASE. THE LACK OF HOUSEKEEPING CREATED A T

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
August 1, 2024
Service date
August 2, 2024
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “DURING INSPECTION OF A PROPOSED 12 STORY BUILDING, I OBSERVED THAT THERE WAS DEBRIS THROUGHOUT THE SITE. THERE WAS MATERIAL IN THE WALKWAY ON THE FLOOR AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039531035X.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039531035X, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 6 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39531036H

Normalized ten-character lookup: 039531036H (infraction 182)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

DURING INSPECTION OF A PROPOSED 12 STORY BUILDING I OBSERVED A NONE FIRE RATED TRAILER AND CARGO CONTAINER ONSITE NEITHER OF WHICH WAS INDICATED ON THE APPROVED SITE SAFETY PLAN WHICH IS REQUIRED. I OBSERVED TH

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
August 1, 2024
Service date
August 2, 2024
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “DURING INSPECTION OF A PROPOSED 12 STORY BUILDING I OBSERVED A NONE FIRE RATED TRAILER AND CARGO CONTAINER ONSITE NEITHER OF WHICH WAS INDICATED ON THE APP…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039531036H.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039531036H, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 7 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39531037J

Normalized ten-character lookup: 039531037J (infraction 1P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: front exposure.

Inspector narrative as preserved in source data — potentially incomplete

BC 3307.2.1 NO DOT PERMIT: DURING INSPECTION OF A PROPOSED 12 STORY BUILDING I OBSERVED THAT THERE WERE CONES IN THE ROADWAY IN FRONT OF THE CONSTRUCTION SITE, ASKED IF THEY HAD A DOT PERMIT TO TAKE UP THE SPOT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
August 1, 2024
Service date
August 2, 2024
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “BC 3307.2.1 NO DOT PERMIT: DURING INSPECTION OF A PROPOSED 12 STORY BUILDING I OBSERVED THAT THERE WERE CONES IN THE ROADWAY IN FRONT OF THE CONSTRUCTION S…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039531037J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039531037J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 2960 Brighton 4 Street, Brooklyn, NY 11235
Summons 8 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39547480K

Normalized ten-character lookup: 039547480K (infraction 182)

November 10 source-listed hearing9:00 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED ROOF PROTECTION CANOPY @ EXPOSURES 2 & 4, UPON REVIEW OF CCD1, THE STIPULATIONS FOR DAILY INSPECTIONS ARE MISSING DISCREPANCIES FOR DEFLECTIONS, DAMAGES, PAGE 14 - LINE 1 & 2, PAGE 15-LINE 3 AND PAGE 1

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
December 1, 2025
Service date
December 1, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 2960 Brighton 4 Street, Brooklyn, NY 11235

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “OBSERVED ROOF PROTECTION CANOPY @ EXPOSURES 2 & 4, UPON REVIEW OF CCD1, THE STIPULATIONS FOR DAILY INSPECTIONS ARE MISSING DISCREPANCIES FOR DEFLECTIONS, D…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039547480K.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Default recorded in source: what to verify before acting

A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.

Need a summons-specific action plan? For 039547480K, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 2960 Brighton 4 Street, Brooklyn, NY 11235
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 2960 Brighton 4 Street, Brooklyn, NY 11235 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (6 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Work contrary to approved plans (2 source summonses): Approved-plan discrepancy review and amendment/permit coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 8, 2026, December 14, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.