3057 Perry Avenue, Bronx, NY 10467 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 3057 Perry Avenue, Bronx, NY 10467 and source-listed date December 4, 2026. Recorded concerns include site safety / construction operations, roadway / sidewalk work-zone permits, sidewalk shed / scaffolding. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsRoadway / sidewalk work-zone permitsSidewalk shed / scaffolding
Verified premises, hearing and enforcement snapshot
Verified premises address
3057 Perry Avenue, Bronx, NY 10467
Borough
Bronx
BIN
2131438
BBL
2033340042
Source summonses
3
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 3057 Perry Avenue, Bronx, NY 10467?
The uploaded record lists 3 summonses, including 039559779N (site safety / construction operations), 039559780K (roadway / sidewalk work-zone permits), 039559778L (sidewalk shed / scaffolding). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 3057 Perry Avenue, Bronx, NY 10467
The verified property matching links 3 distinct summonses to 3057 Perry Avenue, Bronx, NY 10467. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Roadway / sidewalk work-zone permits (1): source summons 039559780K. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039559778L. Check this charge separately, even when its documents can be gathered with other property records.
Site safety / construction operations (1): source summons 039559779N. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list September 26, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Site safety / construction operations — ECB/OATH summons 39559779N
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION OF 4-STORY PROPOSED NB DURING SEVERE WEATHER ADVISORY 9/24-9/27/26, OBSERVED BARRIERS AT EXP. 1 NOT INTERLOCKED OR FILLED WITH SAND/WATER, WHICH MAY BECOME DISPLACED BY HIGH WINDS/FLOO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 3057 Perry Avenue, Bronx, NY 10467
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF 4-STORY PROPOSED NB DURING SEVERE WEATHER ADVISORY 9/24-9/27/26, OBSERVED BARRIERS AT EXP. 1 NOT INTERLOCKED OR FILLED WITH SA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559779N.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559779N, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The inspector identifies work-zone equipment, barriers, containers or temporary occupancy of a street or sidewalk, possibly with a missing or expired DOT permit. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED JERSEY BARRIERS INSTALLED WITHIN ROADWAY IN FRONT OF CONSTRUCTION SITE OCCUPYING PORTION OF STREET AND SIDEWALK. REVIEW OF DOT PERMIT SEARCH SHOWED NO ACTIVE PERMIT FOR ROADWAY OCCUPANCY. CONDITION NOT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 3057 Perry Avenue, Bronx, NY 10467
Determine the exact street/sidewalk location, work-zone equipment, DOT occupancy permit dates and whether pedestrian protection was sufficient. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “OBSERVED JERSEY BARRIERS INSTALLED WITHIN ROADWAY IN FRONT OF CONSTRUCTION SITE OCCUPYING PORTION OF STREET AND SIDEWALK. REVIEW OF DOT PERMIT SEARCH SHOWE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559780K.
Whether a valid permit covered the correct roadway segment, dates and equipment
Whether a temporary encroachment or pedestrian obstruction occurred as described
Whether contemporaneous permits, inspection logs or removal records contradict the allegation
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe sidewalk/roadway obstructions and secure the applicable permit or remove equipment where appropriate.
Coordinate contractor and DOT documentation, photographs and any DOB compliance response for the specific site condition.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
NYC DOT permits and permit effective dates
dated street/sidewalk photos and work-zone layout
barrier, dumpster or equipment placement and removal logs
contractor site-safety inspection and access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559780K, Building Violation LLC can scope roadway/sidewalk work-zone summons analysis and permit coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: front exposure, construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OF A PROPOSED 4-STORY NEW BUILDING CLOSED SITE, OBSERVED PEDESTRIAN WALKWAY AT EXP. 1 BETWEEN FENCE AND BARRIERS NOT MAINTAINING A CONTINUOUS 5-FT CLEAR PATH FREE OF OBSTRUCTIONS, CONTRARY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,400.00
Balance field in extract
$2,400.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 3057 Perry Avenue, Bronx, NY 10467
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: front exposure, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A PROPOSED 4-STORY NEW BUILDING CLOSED SITE, OBSERVED PEDESTRIAN WALKWAY AT EXP. 1 BETWEEN FENCE AND BARRIERS NOT MAINTAINING A CO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559778L.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
site-fence photos, dimensions and inspection log
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559778L, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 3057 Perry Avenue, Bronx, NY 10467 — not just the summons number
For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.