Unpermitted electrical work — ECB/OATH summons 39208859Z
Normalized ten-character lookup: 039208859Z (infraction 2C4)
Source allegation and actual cited law
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data
I OBSERVED TWO ILLUMINATED SIGNS "SIN CITY BURGER" WITH APPROXIMATELY DIMENSIONS OF (L4'XW3"H2') ROUND LOGO (2' DIAMETER) WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
- Issue date
- October 22, 2026
- Service date
- October 22, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 311 East 76 Street, Manhattan, NY 10021
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “I OBSERVED TWO ILLUMINATED SIGNS "SIN CITY BURGER" WITH APPROXIMATELY DIMENSIONS OF (L4'XW3"H2') ROUND LOGO (2' DIAMETER) WITHOUT AN ELECTRICAL PERMIT ON F…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208859Z.
- Whether the cited work required an electrical permit at the relevant time
- Whether a licensed electrician had already filed, inspected or signed off the cited work
- Whether the described installation is correctly located and attributed
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
- If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- licensed electrician report and electrical filing history
- electrical permit/job history and inspection results
- licensed electrician invoices, test reports and sign-offs
- dated photos of panels, circuits or fixtures referenced
- approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208859Z, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with unpermitted electrical work at 311 East 76 Street, Manhattan, NY 10021