NYC DOB / ECB / OATH hearings · verified property resolution

325 Eastern Parkway, Brooklyn, NY 11238 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 325 Eastern Parkway, Brooklyn, NY 11238 and source-listed date December 9, 2026. Recorded concerns include work without a permit, unpermitted electrical work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitUnpermitted electrical work

Verified premises, hearing and enforcement snapshot

Verified premises address
325 Eastern Parkway, Brooklyn, NY 11238
Borough
Brooklyn
BIN
3029660
BBL
3011810052
Source summonses
3
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 325 through 327 EASTERN PARKWAY; 796 through 802 FRANKLIN AVENUE

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 325 Eastern Parkway, Brooklyn, NY 11238?

The uploaded record lists 3 summonses, including 039206035R (unpermitted electrical work), 039206021X (work without a permit), 039206030H (work without a permit). The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39206035R
039206035R
9:30 AM
CLASS - 1Unpermitted electrical workPENDING
39206021X
039206021X
10:30 AM
CLASS - 2Work without a permitPENDING
39206030H
039206030H
10:30 AM
CLASS - 2Work without a permitPENDING

How the 3 recorded summonses relate at 325 Eastern Parkway, Brooklyn, NY 11238

The verified property matching links 3 distinct summonses to 325 Eastern Parkway, Brooklyn, NY 11238. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Work without a permit (2): source summons 039206021X, 039206030H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Unpermitted electrical work (1): source summons 039206035R. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list September 29, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39206035R

Normalized ten-character lookup: 039206035R (infraction 1C9)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation, commercial space, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED ELECTRICAL WORK IN CELLAR, INCLUDING INSTALLATION OF NEW BREAKER BOXES, SPLIT AC UNITS & ASSOCIATED ELECTRICAL, ELECTRICAL CONNECTIONS & DISCONNECT BOX FOR COMMERCIAL OIL FRYERS & OVENS, LIGHTING

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 325 Eastern Parkway, Brooklyn, NY 11238

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation, commercial space, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ELECTRICAL WORK IN CELLAR, INCLUDING INSTALLATION OF NEW BREAKER BOXES, SPLIT AC UNITS & ASSOCIATED ELECTRICAL, ELECTRICAL CONNECTIONS & DISC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206035R.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed electrician report and electrical filing history
  • approved commercial use/occupancy and relevant interior photos
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206035R, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 325 Eastern Parkway, Brooklyn, NY 11238
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39206021X

Normalized ten-character lookup: 039206021X (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, stairs or landings, apartment or dwelling unit, commercial space.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED IN CELLAR UNFINISHED CONSTRUCTION WORK; FRAMING WORK CREATING STORAGES, COMMERCIAL KITCHEN, BATHROOM IN CELLAR. ALSO OBSERVED INSTALLATION OF METAL STAIRCASE CONNECTING CELLAR TO A 1ST-FLR APT CRE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 325 Eastern Parkway, Brooklyn, NY 11238

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, stairs or landings, apartment or dwelling unit, commercial space. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED IN CELLAR UNFINISHED CONSTRUCTION WORK; FRAMING WORK CREATING STORAGES, COMMERCIAL KITCHEN, BATHROOM IN CELLAR. ALSO OBSERVED INSTALLATION OF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206021X.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • stair/landing measurements and dated photos or approved egress plans
  • approved unit layout and relevant lawful occupancy records
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206021X, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 325 Eastern Parkway, Brooklyn, NY 11238
Summons 3 of the source-linked property

Work without a permit — ECB/OATH summons 39206030H

Normalized ten-character lookup: 039206030H (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, commercial space, kitchen or bathroom.

Inspector narrative as preserved in source data

ATOI PLUMBING WORK OBSERVED IN CELLAR, INCLUDING INSTALLATION OF NEW TWO-PIECE BATHROOM, AND COMMERCIAL KITCHEN SINK. NO PERMIT FOUND IN DOB RECORDS FOR THIS WORK. VIOLATION ISSUED., OBTAIN ALL PERMITS

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 325 Eastern Parkway, Brooklyn, NY 11238

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, commercial space, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “ATOI PLUMBING WORK OBSERVED IN CELLAR, INCLUDING INSTALLATION OF NEW TWO-PIECE BATHROOM, AND COMMERCIAL KITCHEN SINK. NO PERMIT FOUND IN DOB RECORDS FOR TH…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206030H.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • approved commercial use/occupancy and relevant interior photos
  • approved wet-room layouts and plumbing/alteration permits
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206030H, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 325 Eastern Parkway, Brooklyn, NY 11238
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 325 Eastern Parkway, Brooklyn, NY 11238 — not just the summons number

For this property, start with work without a permit and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.