NYC DOB / ECB / OATH hearings · verified property resolution

332 Halsey Street, Brooklyn, NY 11216 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 332 Halsey Street, Brooklyn, NY 11216 and source-listed date December 11, 2026. Recorded concerns include site safety / construction operations, fire escape / exit obstruction. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsFire escape / exit obstruction

Verified premises, hearing and enforcement snapshot

Verified premises address
332 Halsey Street, Brooklyn, NY 11216
Borough
Brooklyn
BIN
3053143
BBL
3018470005
Source summonses
3
Hearing dates in source
December 11, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 332 HALSEY STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 332 Halsey Street, Brooklyn, NY 11216?

The uploaded record lists 3 summonses, including 035686070M (site safety / construction operations), 039178890M (fire escape / exit obstruction), 039178891Y (site safety / construction operations). The source-listed hearing date: December 11, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35686070M
035686070M
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39178890M
039178890M
8:30 AM
CLASS - 1Fire escape / exit obstructionPENDING
39178891Y
039178891Y
8:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 3 recorded summonses relate at 332 Halsey Street, Brooklyn, NY 11216

The verified property matching links 3 distinct summonses to 332 Halsey Street, Brooklyn, NY 11216. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (2): source summons 035686070M, 039178891Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Fire escape / exit obstruction (1): source summons 039178890M. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list March 2, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 35686070M

Normalized ten-character lookup: 035686070M (infraction 115)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: cellar or basement area, stairs or landings.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED NO GUARDRAILS WERE INSTALLED AT STAIR OPENINGS. APPROXIMATELYTHIRTY PERCENT(30%) OF THE FIRST FLOOR SUBFLOORS HAS BEEN REMOVED, CREATING OPEN AND UNPROTECTED FLOOR AREAS. THE BASEMENT LEVEL SUBFLOORING

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
March 2, 2026
Service date
March 2, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 332 Halsey Street, Brooklyn, NY 11216

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: cellar or basement area, stairs or landings. Record-specific inspection detail: Inspector text begins: “OBSERVED NO GUARDRAILS WERE INSTALLED AT STAIR OPENINGS. APPROXIMATELYTHIRTY PERCENT(30%) OF THE FIRST FLOOR SUBFLOORS HAS BEEN REMOVED, CREATING OPEN AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035686070M.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • stair/landing measurements and dated photos or approved egress plans
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035686070M, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 332 Halsey Street, Brooklyn, NY 11216
Summons 2 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39178890M

Normalized ten-character lookup: 039178890M (infraction 181)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

CONSTRUCTION MATERIALS WERE STORED AT THE EXPOSURE 1 EXTERIOR AND WITHIN PORTIONS OF THE FIRST-FLOOR INTERIOR. MATERIALS OBSTRUCTED REQUIRED MEANS OF EGRESS, REDUCING CLEAR EXIT ACCESS. COMBUSTIBLE MATERIALS WE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
March 2, 2026
Service date
March 2, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 332 Halsey Street, Brooklyn, NY 11216

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “CONSTRUCTION MATERIALS WERE STORED AT THE EXPOSURE 1 EXTERIOR AND WITHIN PORTIONS OF THE FIRST-FLOOR INTERIOR. MATERIALS OBSTRUCTED REQUIRED MEANS OF EGRES…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039178890M.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039178890M, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 332 Halsey Street, Brooklyn, NY 11216
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39178891Y

Normalized ten-character lookup: 039178891Y (infraction 2F7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED NO APPROVED DEMOLITION SEQUENCE PLANS WERE PRESENT ONSITE. THE PERMIT HOLDER AND/OR RESPONSIBLE PARTY FAILED TO MAINTAIN A COMPLETE, DOB-APPROVED SET OF DEMOLITION DRAWINGS, INCLUDING SEQUENCING AND ST

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
March 2, 2026
Service date
March 2, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 332 Halsey Street, Brooklyn, NY 11216

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED NO APPROVED DEMOLITION SEQUENCE PLANS WERE PRESENT ONSITE. THE PERMIT HOLDER AND/OR RESPONSIBLE PARTY FAILED TO MAINTAIN A COMPLETE, DOB-APPROVED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039178891Y.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039178891Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 332 Halsey Street, Brooklyn, NY 11216
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 332 Halsey Street, Brooklyn, NY 11216 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 11, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.