Certificate of Correction / order noncompliance — ECB/OATH summons 39163216Z
Normalized ten-character lookup: 039163216Z (infraction 263)
Source allegation and actual cited law
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39137131K., FILE A CERTIFICATE OF CORRECTION
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
- Issue date
- October 9, 2025
- Service date
- October 9, 2025
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- DEFAULT
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- NO COMPLIANCE RECORDED
- Penalty field in extract
- $6,250.00
- Balance field in extract
- $6,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 336 Broadway, Brooklyn, NY 11211
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39137131K., FILE A CERTIFICATE OF C…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039163216Z.
- Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
- Whether the prior order references the correct premises and responsible party
- Whether the earlier cited condition has been corrected and what current DOB closeout record shows
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Retrieve the original violation, deadline and agency compliance requirements.
- Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- underlying summons, order and deadline notice
- DOB Certificate of Correction filings and acknowledgments
- before/after dated photographs and signed affidavits where required
- contractor or licensed-professional invoices and sign-offs
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039163216Z, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
Request help with certificate of correction / order noncompliance at 336 Broadway, Brooklyn, NY 11211