Site safety / construction operations — ECB/OATH summons 39560822H
Normalized ten-character lookup: 039560822H (infraction 120)
Source allegation and actual cited law
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: stairs or landings.
Inspector narrative as preserved in source data — potentially incomplete
INSPECTION OF AN ACTIVE 3 STORY BUILDING, I OBSERVED IN THE STAIRCASE THAT THERE WAS NO HANDRAILS INSTALLED AT ALL 3 STORIES. THE LACK OF HANDRAILS CREATES A HAZARD FOR ANYONE WALKING UP AND DOWN THE STAIRS, TO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
- Issue date
- October 20, 2026
- Service date
- October 20, 2026
- Source severity
- CLASS - 1
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 34-27 109 Street, Queens, NY 11368
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “INSPECTION OF AN ACTIVE 3 STORY BUILDING, I OBSERVED IN THE STAIRCASE THAT THERE WAS NO HANDRAILS INSTALLED AT ALL 3 STORIES. THE LACK OF HANDRAILS CREATES…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560822H.
- Whether construction was underway and the cited safety duty applied at the relevant time
- Whether required postings, logs, plans or supervision were in place
- Whether the cited conditions or documents belonged to this job site and respondent
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Correct active site hazards immediately and involve the qualified site safety/contractor team.
- Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stair/landing measurements and dated photos or approved egress plans
- site safety plan, permits and approved construction documents
- daily inspection logs, toolbox talks and supervisory assignments
- dated job-site photos with exposure or floor
- contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560822H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Request help with site safety / construction operations at 34-27 109 Street, Queens, NY 11368