NYC DOB / ECB / OATH hearings · verified property resolution

343 West 47 Street, Manhattan, NY 10036 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 343 West 47 Street, Manhattan, NY 10036 and source-listed date December 3, 2026. Recorded concerns include sidewalk shed / scaffolding, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Sidewalk shed / scaffoldingSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
343 West 47 Street, Manhattan, NY 10036
Borough
Manhattan
BIN
1025089
BBL
1010380011
Source summonses
2
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 343 WEST 47 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 343 West 47 Street, Manhattan, NY 10036?

The uploaded record lists 2 summonses, including 039559884P (sidewalk shed / scaffolding), 039559885R (site safety / construction operations). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559884P
039559884P
9:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
39559885R
039559885R
10:30 AM
CLASS - 1Site safety / construction operationsPENDING

How the 2 recorded summonses relate at 343 West 47 Street, Manhattan, NY 10036

The verified property matching links 2 distinct summonses to 343 West 47 Street, Manhattan, NY 10036. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (1): source summons 039559884P. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039559885R. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 28, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559884P

Normalized ten-character lookup: 039559884P (infraction 2P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF 7 STORY ALT JOB IN PROGRESS WITH SUPPORTED SCAFFOLDING NOT TO CODE SPECIFICATION AS PER 3314.1 CAUSING HAZARDOUS CONDITIONS TO PUBLIC AND PARK WHERE CHILDREN ACTIVELY OCCUPY SPACE: 1.GU

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
September 28, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 343 West 47 Street, Manhattan, NY 10036

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF 7 STORY ALT JOB IN PROGRESS WITH SUPPORTED SCAFFOLDING NOT TO CODE SPECIFICATION AS PER 3314.1 CAUSING HAZARDOUS CONDITIONS TO PUB…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559884P.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559884P, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 343 West 47 Street, Manhattan, NY 10036
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559885R

Normalized ten-character lookup: 039559885R (infraction 119)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OF 7 STORY ALT BUILDING REQUESTED REQUIRED SITE SAFETY PERSONAL AND NON WERE ONSITE AS REQUIRED. STOP ALL WORK PROVIDE REQUIRED PERSONAL.PROVIDED REQUIRED PERSONAL

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 119 — BC 3310.5,27-1009(D) FAIL TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED
Issue date
September 28, 2026
Service date
September 28, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 343 West 47 Street, Manhattan, NY 10036

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF 7 STORY ALT BUILDING REQUESTED REQUIRED SITE SAFETY PERSONAL AND NON WERE ONSITE AS REQUIRED. STOP ALL WORK PROVIDE REQUIRED PERSO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559885R.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559885R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 343 West 47 Street, Manhattan, NY 10036
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 343 West 47 Street, Manhattan, NY 10036 — not just the summons number

For this property, start with sidewalk shed / scaffolding and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.