NYC DOB / ECB / OATH hearings · verified property resolution

344 Maujer Street, Brooklyn, NY 11206 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 344 Maujer Street, Brooklyn, NY 11206 and source-listed date December 18, 2026. Recorded concerns include work without a permit, electrical safety / service equipment, unpermitted electrical work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitElectrical safety / service equipmentUnpermitted electrical work

Verified premises, hearing and enforcement snapshot

Verified premises address
344 Maujer Street, Brooklyn, NY 11206
Borough
Brooklyn
BIN
3325761
BBL
3030210037
Source summonses
4
Hearing dates in source
December 18, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 344 MAUJER STREET; 344A MAUJER STREET; 344B MAUJER STREET; 344C MAUJER STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 344 Maujer Street, Brooklyn, NY 11206?

The uploaded record lists 4 summonses, including 039184659K (work without a permit), 039184660H (electrical safety / service equipment), 039184661J (unpermitted electrical work), 039184662L (work without a permit). The source-listed hearing date: December 18, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39184659K
039184659K
8:30 AM
CLASS - 1Work without a permitPENDING
39184660H
039184660H
8:30 AM
CLASS - 1Electrical safety / service equipmentPENDING
39184661J
039184661J
8:30 AM
CLASS - 2Unpermitted electrical workPENDING
39184662L
039184662L
8:30 AM
CLASS - 2Work without a permitPENDING

How the 4 recorded summonses relate at 344 Maujer Street, Brooklyn, NY 11206

The verified property matching links 4 distinct summonses to 344 Maujer Street, Brooklyn, NY 11206. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Work without a permit (2): source summons 039184659K, 039184662L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Electrical safety / service equipment (1): source summons 039184660H. Check this charge separately, even when its documents can be gathered with other property records.

Unpermitted electrical work (1): source summons 039184661J. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list April 15, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Coordinate licensed-electrical assessment, but distinguish permit history from the asserted equipment safety/maintenance defect.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39184659K

Normalized ten-character lookup: 039184659K (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

OBSERVED AT 344 C, DEMOLITION IS UNDERWAY. REMOVED THE PARTITION WALLS ALONG WITH THE FIRE STOPPING. NO CONSTRUCTION PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 15, 2026
Service date
April 15, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 344 Maujer Street, Brooklyn, NY 11206

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED AT 344 C, DEMOLITION IS UNDERWAY. REMOVED THE PARTITION WALLS ALONG WITH THE FIRE STOPPING. NO CONSTRUCTION PERMIT FOR THIS WORK AT THE TIME OF IN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184659K.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184659K, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 344 Maujer Street, Brooklyn, NY 11206
Summons 2 of the source-linked property

Electrical safety / service equipment — ECB/OATH summons 39184660H

Normalized ten-character lookup: 039184660H (infraction 1D2)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED AT 344C, AT T 9:34 AM APRIL 15TH, 2026, UNSAFE UNSECURED ELECTRICAL WIRING WITH OPEN CONDUCTORS AND IMPROPER SUPPORT FOR THE WIRING CREATING A POTENTIAL RISK OF SHOCK AND OR FIRE HAZARD WHILE THE WORKE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
April 15, 2026
Service date
April 15, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 344 Maujer Street, Brooklyn, NY 11206

Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED AT 344C, AT T 9:34 AM APRIL 15TH, 2026, UNSAFE UNSECURED ELECTRICAL WIRING WITH OPEN CONDUCTORS AND IMPROPER SUPPORT FOR THE WIRING CREATING A POT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184660H.

  • Whether the cited component, clearance or unsafe condition existed as described
  • Whether the equipment met the applicable requirements and was inspected/maintained
  • Whether the notice identified the correct location and owner responsibility
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
  • Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • electrical service and panel photographs with location
  • licensed electrician safety evaluation and invoices
  • electrical permits, inspections and test reports
  • equipment specification or maintenance and repair records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184660H, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.

Request help with electrical safety / service equipment at 344 Maujer Street, Brooklyn, NY 11206
Summons 3 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39184661J

Normalized ten-character lookup: 039184661J (infraction 2C4)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED AT 344C AT 09:34 AM APRIL 15,2026, REMOVED ALL OF THE EXISTING ELECTRICAL WIRING ALONG WITH THE SWITCHES, OUTLETS AND ELECTRICAL FIXTURES. NO ELECTRICAL PERMIT FOR THIS SCOPE OF WORK AT THE TIME OF INS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
April 15, 2026
Service date
April 15, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 344 Maujer Street, Brooklyn, NY 11206

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED AT 344C AT 09:34 AM APRIL 15,2026, REMOVED ALL OF THE EXISTING ELECTRICAL WIRING ALONG WITH THE SWITCHES, OUTLETS AND ELECTRICAL FIXTURES. NO ELEC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184661J.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184661J, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 344 Maujer Street, Brooklyn, NY 11206
Summons 4 of the source-linked property

Work without a permit — ECB/OATH summons 39184662L

Normalized ten-character lookup: 039184662L (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

OBSERVED AT 344C, NEW PLUMBING WORK IN ONE ROOM. INSTALLED NEW COPPER PIPING. NO PLUMBING PERMIT FOR SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN ALL PERMITS

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 15, 2026
Service date
April 15, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 344 Maujer Street, Brooklyn, NY 11206

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED AT 344C, NEW PLUMBING WORK IN ONE ROOM. INSTALLED NEW COPPER PIPING. NO PLUMBING PERMIT FOR SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN ALL P…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184662L.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184662L, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 344 Maujer Street, Brooklyn, NY 11206
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 344 Maujer Street, Brooklyn, NY 11206 — not just the summons number

For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Electrical safety / service equipment (1 source summons): Electrical maintenance summons analysis and licensed-trade remediation.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 18, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.