Stop-work order / continued work — ECB/OATH summons 39560142Y
Normalized ten-character lookup: 039560142Y (infraction 2P7)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
PARTIAL STOP WORK ORDER FOR SUPPORTED SCAFFOLD. I OBSERVED AN INSTALLED SUPP SCAFFOLD AT EXP#1. SCAFFOLD MISSING PINS. NOT FULLY PLANKED. MISSING GUARDRAILS. PLANKS NOT TIDE DOWN . SCAFFOLD NOT PLUMB. DEBRIS N
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2P7
- Issue date
- October 5, 2026
- Service date
- October 5, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 36 Woodbine Street, Brooklyn, NY 11221
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “PARTIAL STOP WORK ORDER FOR SUPPORTED SCAFFOLD. I OBSERVED AN INSTALLED SUPP SCAFFOLD AT EXP#1. SCAFFOLD MISSING PINS. NOT FULLY PLANKED. MISSING GUARDRAIL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560142Y.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560142Y, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Request help with stop-work order / continued work at 36 Woodbine Street, Brooklyn, NY 11221