Work contrary to approved plans — ECB/OATH summons 39561020K
Normalized ten-character lookup: 039561020K (infraction 182)
Source allegation and actual cited law
The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OF A VERTICAL ENLARGEMENT OF A 5 STORIES BUILDING I OBSERVED MOBILE CRANE IN OPERATION ON THE STREET, UPON REVIEW THE SITE SAFETY PLAN TO VERIFY COMPLIANCE THE MOBILE CRANE WAS NOT SHOWN O
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
- Issue date
- October 24, 2026
- Service date
- October 24, 2026
- Source severity
- CLASS - 1
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 361 Central Park West, Manhattan, NY 10025
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A VERTICAL ENLARGEMENT OF A 5 STORIES BUILDING I OBSERVED MOBILE CRANE IN OPERATION ON THE STREET, UPON REVIEW THE SITE SAFETY PLA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561020K.
- Whether the cited plans were the operative approved set on the inspection date
- Whether an approved amendment, phased work or as-built record covers the observed condition
- Whether the alleged difference is accurately described and located
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Compare field conditions with approved documents through a registered design professional.
- Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- approved plans, amendments and application history
- current as-built measurements or professional field report
- dated construction photographs and contractor records
- inspection and sign-off documents
- property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561020K, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Request help with work contrary to approved plans at 361 Central Park West, Manhattan, NY 10025