Stop-work order / continued work — ECB/OATH summons 39179569K
Normalized ten-character lookup: 039179569K (infraction 2C2)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: construction fence or enclosure, structural framing.
Inspector narrative as preserved in source data — potentially incomplete
AFTER HOURS STOP WORK ORDER SERVED FOR NON COMPLIANT AFTER HOURS WORK DUE TO 2 WORKERS OBSERVED PERFORMING CONSTRUCTION OPERATIONS AT EXPOSURE 1 OF STRUCTURE. ( 6 FOOT METAL FENCE INSTALLATION). PERMIT # B00803
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2C2 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
- Issue date
- March 8, 2026
- Service date
- March 8, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 371 Hawthorne Street, Brooklyn, NY 11225
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: construction fence or enclosure, structural framing. Record-specific inspection detail: Inspector text begins: “AFTER HOURS STOP WORK ORDER SERVED FOR NON COMPLIANT AFTER HOURS WORK DUE TO 2 WORKERS OBSERVED PERFORMING CONSTRUCTION OPERATIONS AT EXPOSURE 1 OF STRUCTU…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039179569K.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- site-fence photos, dimensions and inspection log
- approved framing plans and structural engineer assessment
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.