374 Wallabout Street, Brooklyn, NY 11206 — Work contrary to approved plans and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 374 Wallabout Street, Brooklyn, NY 11206 and source-listed dates December 2, 2026, December 9, 2026. Recorded concerns include work contrary to approved plans, stop-work order / continued work, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work contrary to approved plansStop-work order / continued workSite safety / construction operations
Verified premises, hearing and enforcement snapshot
Verified premises address
374 Wallabout Street, Brooklyn, NY 11206
Borough
Brooklyn
BIN
3061430
BBL
3022660013
Source summonses
3
Hearing dates in source
December 2, 2026, December 9, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 374 WALLABOUT STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 374 Wallabout Street, Brooklyn, NY 11206?
The uploaded record lists 3 summonses, including 039205271Y (work contrary to approved plans), 039205364N (stop-work order / continued work), 039205945L (site safety / construction operations). The source-listed hearing dates: December 2, 2026, December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 374 Wallabout Street, Brooklyn, NY 11206
The verified property matching links 3 distinct summonses to 374 Wallabout Street, Brooklyn, NY 11206. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Site safety / construction operations (1): source summons 039205945L. Check this charge separately, even when its documents can be gathered with other property records.
Stop-work order / continued work (1): source summons 039205364N. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039205271Y. Check this charge separately, even when its documents can be gathered with other property records.
More than one source-listed hearing date: December 2, 2026, December 9, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work contrary to approved plans — ECB/OATH summons 39205271Y
The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
WORKED CONTRARY M&M DEBRIS REMOVAL,NOTES KOMATSU EXCVATOR SOLE PURPOSE LOAD DEBRIS INTO DUMPSTER TRUCK,ONLY MINI EXCVATOR ALLOWED IN SITE TO REMOVE DEBRIS,MAINTAIN MIN.WORK DISTANCE AWAY ADJ.PROPERTIES OF 8 FEE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 374 Wallabout Street, Brooklyn, NY 11206
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “WORKED CONTRARY M&M DEBRIS REMOVAL,NOTES KOMATSU EXCVATOR SOLE PURPOSE LOAD DEBRIS INTO DUMPSTER TRUCK,ONLY MINI EXCVATOR ALLOWED IN SITE TO REMOVE DEBRIS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205271Y.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205271Y, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: elevator or lift.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED STREET OPERATION BOOM LIFT AND 2 WORKERS PERFORMING WEATHERPROOFING WORK ON ADJACENT PROPERTY AT EXPOSURE 2. JOBSITE IN UNDER FSWO AND PERMIT #32147107
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 17, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 374 Wallabout Street, Brooklyn, NY 11206
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: elevator or lift. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED STREET OPERATION BOOM LIFT AND 2 WORKERS PERFORMING WEATHERPROOFING WORK ON ADJACENT PROPERTY AT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205364N.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
device inspection and service documentation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205364N, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
3 STORY BUILDING WITH 6 CLASS A APARTMENTS FULLY DEMO NO PERMIT AND NO NOTIFICATION BC3306.3 PRIOR TO WORK,NO DESIGNATION CS PER BC3301.13.3 ITEM#2,AND FAILED GIVE ADVANCE NOTICE TO UTILITY COMPANIES BC3306.9,B
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 374 Wallabout Street, Brooklyn, NY 11206
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “3 STORY BUILDING WITH 6 CLASS A APARTMENTS FULLY DEMO NO PERMIT AND NO NOTIFICATION BC3306.3 PRIOR TO WORK,NO DESIGNATION CS PER BC3301.13.3 ITEM#2,AND FAI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205945L.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205945L, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 374 Wallabout Street, Brooklyn, NY 11206 — not just the summons number
For this property, start with work contrary to approved plans and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 2, 2026, December 9, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.