376 Schermerhorn Street, Brooklyn, NY 11217 — Site safety / construction operations and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 8 DOB/ECB/OATH summonses with 376 Schermerhorn Street, Brooklyn, NY 11217 and source-listed date December 16, 2026. Recorded concerns include site safety / construction operations, construction fall / overhead protection, sidewalk shed / scaffolding and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Site safety / construction operationsConstruction fall / overhead protectionSidewalk shed / scaffoldingWork contrary to approved plansFire escape / exit obstruction
Verified premises, hearing and enforcement snapshot
Verified premises address
376 Schermerhorn Street, Brooklyn, NY 11217
Borough
Brooklyn
BIN
3430062
BBL
Not provided
Source summonses
8
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source identifier caveat: OATH and CSV lot discrepancy. Check the original ticket before relying on a conflicting lot identifier.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 376 Schermerhorn Street, Brooklyn, NY 11217?
The uploaded record lists 8 summonses, including 039560377Z (construction fall / overhead protection), 039560378K (site safety / construction operations), 039560381L (sidewalk shed / scaffolding), 039560399J (site safety / construction operations) and additional tickets. The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 8 recorded summonses relate at 376 Schermerhorn Street, Brooklyn, NY 11217
The verified property matching links 8 distinct summonses to 376 Schermerhorn Street, Brooklyn, NY 11217. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Site safety / construction operations (4): source summons 039560378K, 039560399J, 039560379M, 039560400H. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Construction fall / overhead protection (1): source summons 039560377Z. Check this charge separately, even when its documents can be gathered with other property records.
Fire escape / exit obstruction (1): source summons 039560398H. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039560381L. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039560380J. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 8 summonses list October 8, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Construction fall / overhead protection — ECB/OATH summons 39560377Z
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED CONCRETE STRIPPING COMPLETED AT THE 12TH FLOOR WITH HORIZONTAL SAFETY NETTING INSTALLED AT THE 9TH FLOOR ALONG EXPOSURES 3 AND 4, THREE STORIES BELOW THE STRIPPING FLOOR, CONTRAR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED CONCRETE STRIPPING COMPLETED AT THE 12TH FLOOR WITH HORIZONTAL SAFETY NETTING INSTALLED AT THE 9TH FLOOR ALONG EXPOSURES 3…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560377Z.
Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
Whether engineered protection drawings and installation records cover the cited area
Whether the cited work phase or affected neighboring area is accurately identified
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan and engineered protection details
dated photographs tied to the specific exposure and floor
guardrail, netting or overhead-cover installation and inspection records
contractor corrective work logs and any adjacent-property access records
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560377Z, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED CONTROLLED ACCESS ZONE NOT ESTABLISHED AT THE 15TH-FLOOR PERIMETER EDGES, CONTRARY TO BC 3308.10, CREATING RISK OF UNAUTHORIZED ACCESS TO THE UNENCLOSED PERIMETER EDGE AND FALL H
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED CONTROLLED ACCESS ZONE NOT ESTABLISHED AT THE 15TH-FLOOR PERIMETER EDGES, CONTRARY TO BC 3308.10, CREATING RISK OF UNAUTHOR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560378K.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560378K, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED WORKERS USING PERI SHORING AND BRACING SYSTEM AS SCAFFOLDING DURING STRIPPING OPERATIONS, CONTRARY TO MANUFACTURER SPECIFICATIONS. PLANKS WERE INSTALLED AT UNEVEN ELEVATIONS AND
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1N4
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED WORKERS USING PERI SHORING AND BRACING SYSTEM AS SCAFFOLDING DURING STRIPPING OPERATIONS, CONTRARY TO MANUFACTURER SPECIFIC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560381L.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560381L, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED CONCRETE STRIPPING OPERATIONS AT THE 11TH FLOOR WHILE THE 15TH FLOOR WAS BEING FORMED, EXCEEDING THE MAXIMUM PERMITTED SEPARATION OF THREE STORIES, CONTRARY TO BC 3305.3.6.6. STO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED CONCRETE STRIPPING OPERATIONS AT THE 11TH FLOOR WHILE THE 15TH FLOOR WAS BEING FORMED, EXCEEDING THE MAXIMUM PERMITTED SEPA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560399J.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560399J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED INADEQUATE GUARDRAIL SYSTEMS THROUGHOUT BUILDING, WITH SECTIONS COMPLETELY MISSING OR INADEQUATELY MAINTAINED, CONTRARY TO BC 3308.7, CREATING FALL HAZARDS TO WORKERS AND STRUCK-
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED INADEQUATE GUARDRAIL SYSTEMS THROUGHOUT BUILDING, WITH SECTIONS COMPLETELY MISSING OR INADEQUATELY MAINTAINED, CONTRARY TO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560379M.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560379M, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED STREET-LEVEL CONSTRUCTION DELIVERY OPERATIONS CONDUCTED WITHOUT ADEQUATE PEDESTRIAN SAFEGUARDS, CAUSING PEDESTRIANS TO ENTER ACTIVE VEHICULAR TRAFFIC, CONTRARY TO BC 3301.2, CREA
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED STREET-LEVEL CONSTRUCTION DELIVERY OPERATIONS CONDUCTED WITHOUT ADEQUATE PEDESTRIAN SAFEGUARDS, CAUSING PEDESTRIANS TO ENTE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560400H.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560400H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED WORKERS TIED OFF TO UNCAGED REBAR COLUMNS, COCOON SYSTEMS AND HORIZONTAL SAFETY NETTING TIEBACK LINES. APPROVED DRAWINGS SPECIFY ANCHOR POINTS, STRAPS WRAPPED AROUND COLUMNS OR C
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED WORKERS TIED OFF TO UNCAGED REBAR COLUMNS, COCOON SYSTEMS AND HORIZONTAL SAFETY NETTING TIEBACK LINES. APPROVED DRAWINGS SP…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560380J.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560380J, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route, mezzanine or loft.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED MEANS OF EGRESS OBSTRUCTED ON MULTIPLE FLOORS, INCLUDING CAGED-OFF MEZZANINE ACCESS AND LADDERS BLOCKING STAIRCASES, CREATING HAZARDS TO WORKERS, VISITORS AND FIRST RESPONDERS BY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 376 Schermerhorn Street, Brooklyn, NY 11217
Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route, mezzanine or loft. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED MEANS OF EGRESS OBSTRUCTED ON MULTIPLE FLOORS, INCLUDING CAGED-OFF MEZZANINE ACCESS AND LADDERS BLOCKING STAIRCASES, CREATI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560398H.
Whether the cited route is a required exit component for this occupancy
Whether the alleged objects, locks or configuration actually affected required egress at the cited location
Whether the area and date are accurately identified and whether correction can be documented
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Remove hazards and restore required safe egress immediately.
When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
door/exit photographs and approved egress plans
approved floor elevations and dated mezzanine/loft photos
photographs of the exact door, stair, hall, landing or fire escape
approved floor and means-of-egress plans
repair/removal invoices and dated completion photographs
fire-escape or professional inspection and compliance records
property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560398H, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 376 Schermerhorn Street, Brooklyn, NY 11217 — not just the summons number
For this property, start with site safety / construction operations and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (4 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.
Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.