38 Dodworth Street, Brooklyn, NY 11221 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 38 Dodworth Street, Brooklyn, NY 11221 and source-listed dates December 7, 2026, December 16, 2026. Recorded concerns include sidewalk shed / scaffolding, construction fall / overhead protection, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Sidewalk shed / scaffoldingConstruction fall / overhead protectionStop-work order / continued work
Verified premises, hearing and enforcement snapshot
Verified premises address
38 Dodworth Street, Brooklyn, NY 11221
Borough
Brooklyn
BIN
3073452
BBL
3032300013
Source summonses
3
Hearing dates in source
December 7, 2026, December 16, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 38 DODWORTH STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 38 Dodworth Street, Brooklyn, NY 11221?
The uploaded record lists 3 summonses, including 039557125P (sidewalk shed / scaffolding), 039557126R (construction fall / overhead protection), 039558432J (stop-work order / continued work). The source-listed hearing dates: December 7, 2026, December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 38 Dodworth Street, Brooklyn, NY 11221
The verified property matching links 3 distinct summonses to 38 Dodworth Street, Brooklyn, NY 11221. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Construction fall / overhead protection (1): source summons 039557126R. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039557125P. Check this charge separately, even when its documents can be gathered with other property records.
Stop-work order / continued work (1): source summons 039558432J. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list July 27, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 7, 2026, December 16, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: air-conditioning or mechanical equipment.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED A SUSPENDED SCAFFOLD INSTALLED WITHOUT THE REQUIRED PERMIT AND SITE-SPECIFIC DESIGN DRAWINGS, CONTRARY TO AC 28-105.1 AND BC 3314.2. UPON REQUEST, NO PERMIT OR REQUIRED DESIGN DR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2L1 — 28-105.1 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATIO
Issue date
July 27, 2026
Service date
July 28, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 38 Dodworth Street, Brooklyn, NY 11221
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED A SUSPENDED SCAFFOLD INSTALLED WITHOUT THE REQUIRED PERMIT AND SITE-SPECIFIC DESIGN DRAWINGS, CONTRARY TO AC 28-105.1 AND B…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039557125P.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
equipment photos and licensed installation/permit evidence
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039557125P, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED WORKERS PERFORMING WORK AT UNPROTECTED LEADING EDGES AND PLATFORMS EXCEEDING 6 FEET ABOVE A LOWER LEVEL WITHOUT THE REQUIRED GUARDRAIL SYSTEM, CONTRARY TO BC 3315.1.5. THE CONDIT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
July 27, 2026
Service date
July 28, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 38 Dodworth Street, Brooklyn, NY 11221
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED WORKERS PERFORMING WORK AT UNPROTECTED LEADING EDGES AND PLATFORMS EXCEEDING 6 FEET ABOVE A LOWER LEVEL WITHOUT THE REQUIRE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039557126R.
Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
Whether engineered protection drawings and installation records cover the cited area
Whether the cited work phase or affected neighboring area is accurately identified
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site safety plan and engineered protection details
dated photographs tied to the specific exposure and floor
guardrail, netting or overhead-cover installation and inspection records
contractor corrective work logs and any adjacent-property access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039557126R, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONTRACTOR WAS PERFORMING WORK IN VIOLATION OF A STOP WORK ORDER (SWO) ISSUED ON 08/12/2026. EXTERIOR FACADE WORK AT THE BUILDING WAS OBSERVED TO BE COMPLETED
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 25, 2026
Service date
August 26, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 38 Dodworth Street, Brooklyn, NY 11221
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONTRACTOR WAS PERFORMING WORK IN VIOLATION OF A STOP WORK ORDER (SWO) ISSUED ON 08/12/2026. EXTERIOR F…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558432J.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
photographs by elevation and facade professional repair reports
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039558432J, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 38 Dodworth Street, Brooklyn, NY 11221 — not just the summons number
For this property, start with sidewalk shed / scaffolding and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Construction fall / overhead protection (1 source summons): Construction fall-protection and overhead-safety hearing preparation.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 7, 2026, December 16, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.