The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 3862 Sedgwick Avenue, Bronx, NY 10463 and source-listed date December 4, 2026. Recorded concerns include site safety / construction operations, construction fence / site protection, sidewalk shed / scaffolding. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsConstruction fence / site protectionSidewalk shed / scaffolding

Verified premises, hearing and enforcement snapshot

Verified premises address
3862 Sedgwick Avenue, Bronx, NY 10463
Borough
Bronx
BIN
2015230
BBL
2032460069
Source summonses
5
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 3862 Sedgwick Avenue, Bronx, NY 10463?

The uploaded record lists 5 summonses, including 039559729P (site safety / construction operations), 039559739Z (construction fence / site protection), 039559737P (site safety / construction operations), 039559740X (sidewalk shed / scaffolding) and additional tickets. The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559729P
039559729P
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39559739Z
039559739Z
8:30 AM
CLASS - 1Construction fence / site protectionPENDING
39559737P
039559737P
9:30 AM
CLASS - 1Site safety / construction operationsPENDING
39559740X
039559740X
9:30 AM
CLASS - 1Sidewalk shed / scaffoldingPENDING
39559738R
039559738R
10:30 AM
CLASS - 1Site safety / construction operationsPENDING

How the 5 recorded summonses relate at 3862 Sedgwick Avenue, Bronx, NY 10463

The verified property matching links 5 distinct summonses to 3862 Sedgwick Avenue, Bronx, NY 10463. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (3): source summons 039559729P, 039559737P, 039559738R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fence / site protection (1): source summons 039559739Z. Check this charge separately, even when its documents can be gathered with other property records.

Sidewalk shed / scaffolding (1): source summons 039559740X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 5 summonses list September 26, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559729P

Normalized ten-character lookup: 039559729P (infraction 2A7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF INSPECTION, CONSTRUCTION WORK WAS ACTIVELY IN PROGRESS UNDER AFTER-HOURS VARIANCE PERMIT #X8178279 FOR WEEKEND WORK. WORKERS WERE OBSERVED PERFORMING INTERIOR CONSTRUCTION ACTIVITIES FROM ACROSS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 3862 Sedgwick Avenue, Bronx, NY 10463

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, CONSTRUCTION WORK WAS ACTIVELY IN PROGRESS UNDER AFTER-HOURS VARIANCE PERMIT #X8178279 FOR WEEKEND WORK. WORKERS WERE OBSERVED P…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559729P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559729P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 3862 Sedgwick Avenue, Bronx, NY 10463
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39559739Z

Normalized ten-character lookup: 039559739Z (infraction 181)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure, electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF INSPECTION OF A 7-STORY NEW BUILDING, I OBSERVED FROM STREET TRUE CONSTRUCTION FENCE VIEWING PANEL, LAGER AMOUNT OF DEBRIS PILE UP IN THE SIDE YARD, CREATING A HAZARDS CONDITION FOR SLIP, TRIP, F

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 3862 Sedgwick Avenue, Bronx, NY 10463

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF A 7-STORY NEW BUILDING, I OBSERVED FROM STREET TRUE CONSTRUCTION FENCE VIEWING PANEL, LAGER AMOUNT OF DEBRIS PILE UP IN THE SI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559739Z.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • licensed electrician report and electrical filing history
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559739Z, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 3862 Sedgwick Avenue, Bronx, NY 10463
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559737P

Normalized ten-character lookup: 039559737P (infraction 119)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS UNDER AFTER HOURS VARIANCE PERMIT# X8178279 FOR WEEKEND OPERATION, WORKERS DENIED ACCESS AND THERE WERE NO SITE SAFETY MANAGER OR COORDINATOR PRESENCE AND

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 119 — BC 3310.5,27-1009(D) FAIL TO HAVE SITE SAFETY MGR/COORDINATOR PRESENT AS REQUIRED
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 3862 Sedgwick Avenue, Bronx, NY 10463

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS UNDER AFTER HOURS VARIANCE PERMIT# X8178279 FOR WEEKEND OPERATION, WORKERS DENIED ACCESS AND THERE W…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559737P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559737P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 3862 Sedgwick Avenue, Bronx, NY 10463
Summons 4 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559740X

Normalized ten-character lookup: 039559740X (infraction 1P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF A 7-STORY NEW BUILDING, I OBSERVED PIPE SCAFFOLDS ERECTED NOT MAINTAINED AS PER CODE 3314.1 INADEQUATE PLANKING AND NOT PROPERLY SECURED, AND REQUIRED GUARDRAILS WERE NOT PROVIDED, INAD

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 3862 Sedgwick Avenue, Bronx, NY 10463

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A 7-STORY NEW BUILDING, I OBSERVED PIPE SCAFFOLDS ERECTED NOT MAINTAINED AS PER CODE 3314.1 INADEQUATE PLANKING AND NOT PROPERLY S…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559740X.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559740X, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 3862 Sedgwick Avenue, Bronx, NY 10463
Summons 5 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559738R

Normalized ten-character lookup: 039559738R (infraction 1P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS UNDER AFTER HOURS VARIANCE PERMIT X8178279 FOR WEEKEND OPERATION, WORKERS DENIED ACCESS AND THERE WERE NO CONSTRUCTION SUPERINTENDENT PRESENCE AND AVAILABL

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
September 26, 2026
Service date
September 26, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 3862 Sedgwick Avenue, Bronx, NY 10463

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS UNDER AFTER HOURS VARIANCE PERMIT X8178279 FOR WEEKEND OPERATION, WORKERS DENIED ACCESS AND THERE WE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559738R.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559738R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 3862 Sedgwick Avenue, Bronx, NY 10463
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 3862 Sedgwick Avenue, Bronx, NY 10463 — not just the summons number

For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.