4020 18 Avenue, Brooklyn, NY 11218 — Stop-work order / continued work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 4020 18 Avenue, Brooklyn, NY 11218 and source-listed dates December 11, 2026, December 23, 2026. Recorded concerns include stop-work order / continued work, work without a permit, certificate of correction / order noncompliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Stop-work order / continued workWork without a permitCertificate of Correction / order noncompliance
Verified premises, hearing and enforcement snapshot
Verified premises address
4020 18 Avenue, Brooklyn, NY 11218
Borough
Brooklyn
BIN
3127624
BBL
3054110043
Source summonses
4
Hearing dates in source
December 11, 2026, December 23, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 4020 18 AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 4020 18 Avenue, Brooklyn, NY 11218?
The uploaded record lists 4 summonses, including 039187711M (work without a permit), 039187713X (stop-work order / continued work), 039187714H (certificate of correction / order noncompliance), 039207769K (stop-work order / continued work). The source-listed hearing dates: December 11, 2026, December 23, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 4 recorded summonses relate at 4020 18 Avenue, Brooklyn, NY 11218
The verified property matching links 4 distinct summonses to 4020 18 Avenue, Brooklyn, NY 11218. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Stop-work order / continued work (2): source summons 039187713X, 039207769K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Certificate of Correction / order noncompliance (1): source summons 039187714H. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039187711M. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list May 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Identify whether an earlier unpermitted-work condition underlies a later failure-to-certify charge. Legalizing the work alone may not close the separate correction-order record.
Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.
More than one source-listed hearing date: December 11, 2026, December 23, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work without a permit — ECB/OATH summons 39187711M
DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
WORK WITHOUT A PERMIT, BUSINESS AWNING SIGNS APPOX 20'X3' BLACK BACKGROUND WITH WHITE LETTERINGS READ TLC LFA DMV SERVICES INSTALLED WITHOUT A PERMIT., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
May 7, 2026
Service date
May 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 4020 18 Avenue, Brooklyn, NY 11218
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT, BUSINESS AWNING SIGNS APPOX 20'X3' BLACK BACKGROUND WITH WHITE LETTERINGS READ TLC LFA DMV SERVICES INSTALLED WITHOUT A PERMIT., OBT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039187711M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039187711M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTIONS WITH DEPARTMENT OF BUILDINGS. SUMMONS #39174756N ISSUED 01/22/2026 FOR WORK AGAINST SWO AND NO RECORDS OF CORRECTIONS, FILE A
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
May 7, 2026
Service date
May 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 4020 18 Avenue, Brooklyn, NY 11218
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTIONS WITH DEPARTMENT OF BUILDINGS. SUMMONS #39174756N ISSUED 01/22/2026 FOR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039187713X.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039187713X, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. SUMMONS # 39098231Z ISSUED ON 10/28/2023 WITH NO RECORDS OF RESCINDS AND PERMITS AT TIME OF
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
May 7, 2026
Service date
May 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 4020 18 Avenue, Brooklyn, NY 11218
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. SUMMONS # 39098231Z ISSUED ON 10/28/2…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039187714H.
Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
Whether the prior order references the correct premises and responsible party
Whether the earlier cited condition has been corrected and what current DOB closeout record shows
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Retrieve the original violation, deadline and agency compliance requirements.
Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
underlying summons, order and deadline notice
DOB Certificate of Correction filings and acknowledgments
before/after dated photographs and signed affidavits where required
contractor or licensed-professional invoices and sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039187714H, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. RECORDS 10/29/2023 - L1 - PARTIAL STOP WORK ORDER WITH SUMMON # 39098231Z ON 10/29/2023. BY - BY BADGE # 2668 COSIMANO FRANK. NO RECORDS OF RE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
October 14, 2026
Service date
October 14, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 4020 18 Avenue, Brooklyn, NY 11218
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. RECORDS 10/29/2023 - L1 - PARTIAL STOP WORK ORDER WITH SUMMON # 39098231Z ON 10/29/2023…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207769K.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207769K, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 4020 18 Avenue, Brooklyn, NY 11218 — not just the summons number
For this property, start with stop-work order / continued work and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Stop-work order / continued work (2 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
Certificate of Correction / order noncompliance (1 source summons): Underlying-case research, correction paperwork and DOB compliance closeout.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 11, 2026, December 23, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.