The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: stairs or landings.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO DISPLAY/MAINTAIN ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33:-AS NOTED AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING ACTIVELY DOING INTERIOR FINISHING AND STAIR INSTALLATION. I OBSERVED A ST
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
- Issue date
- October 14, 2026
- Service date
- October 14, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 41 Brighton 4 Court, Brooklyn, NY 11235
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “FAILURE TO DISPLAY/MAINTAIN ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33:-AS NOTED AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING ACTIVELY DOING INT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035730278R.
- Whether construction was underway and the cited safety duty applied at the relevant time
- Whether required postings, logs, plans or supervision were in place
- Whether the cited conditions or documents belonged to this job site and respondent
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Correct active site hazards immediately and involve the qualified site safety/contractor team.
- Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stair/landing measurements and dated photos or approved egress plans
- site safety plan, permits and approved construction documents
- daily inspection logs, toolbox talks and supervisory assignments
- dated job-site photos with exposure or floor
- contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035730278R, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Request help with site safety / construction operations at 41 Brighton 4 Court, Brooklyn, NY 11235