NYC DOB / ECB / OATH hearings · verified property resolution

421 East 114 Street, Manhattan, NY 10029 — Certificate of Correction / order noncompliance and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 421 East 114 Street, Manhattan, NY 10029 and source-listed date December 3, 2026. Recorded concerns include certificate of correction / order noncompliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Certificate of Correction / order noncompliance

Verified premises, hearing and enforcement snapshot

Verified premises address
421 East 114 Street, Manhattan, NY 10029
Borough
Manhattan
BIN
1053011
BBL
1017080012
Source summonses
3
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 421 EAST 114 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 421 East 114 Street, Manhattan, NY 10029?

The uploaded record lists 3 summonses, including 039205437P (certificate of correction / order noncompliance), 039205438R (certificate of correction / order noncompliance), 039205436N (certificate of correction / order noncompliance). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39205437P
039205437P
8:30 AM
CLASS - 1Certificate of Correction / order noncompliancePENDING
39205438R
039205438R
9:30 AM
CLASS - 2Certificate of Correction / order noncompliancePENDING
39205436N
039205436N
10:30 AM
CLASS - 2Certificate of Correction / order noncompliancePENDING

How the 3 recorded summonses relate at 421 East 114 Street, Manhattan, NY 10029

The verified property matching links 3 distinct summonses to 421 East 114 Street, Manhattan, NY 10029. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Certificate of Correction / order noncompliance (3): source summons 039205437P, 039205438R, 039205436N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 3 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39205437P

Normalized ten-character lookup: 039205437P (infraction 187)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. Key locations/components named in the source: cellar or basement area.

Inspector narrative as preserved in source data — potentially incomplete

NO ACCESS. AT TIME OF INSPECTION, NO PERMIT WAS ON FILE FOR VIOLATION #39132288X, ISSUED 12/07/2024, CITING UNPERMITTED REMOVAL OF THE EXISTING CELLAR MAIN WASTE LINE AND REPLACEMENT WITH A NEW 4" CAST-IRON WAS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 421 East 114 Street, Manhattan, NY 10029

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “NO ACCESS. AT TIME OF INSPECTION, NO PERMIT WAS ON FILE FOR VIOLATION #39132288X, ISSUED 12/07/2024, CITING UNPERMITTED REMOVAL OF THE EXISTING CELLAR MAIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205437P.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205437P, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 421 East 114 Street, Manhattan, NY 10029
Summons 2 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39205438R

Normalized ten-character lookup: 039205438R (infraction 263)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. Key locations/components named in the source: cellar or basement area.

Inspector narrative as preserved in source data — potentially incomplete

NO ACCESS. UNABLE TO GAIN ACCESS TO CELLAR. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #39132289H, ISSUED 12/07/2024, CITING JOISTS WITH SEVERE WATER DAMAGE, INCLUDING THE MA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 421 East 114 Street, Manhattan, NY 10029

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “NO ACCESS. UNABLE TO GAIN ACCESS TO CELLAR. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 FAILURE TO MAINTAIN VIOLATION #39132289H, ISSUED 12/07/2024, C…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205438R.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205438R, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 421 East 114 Street, Manhattan, NY 10029
Summons 3 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39205436N

Normalized ten-character lookup: 039205436N (infraction 263)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. Key locations/components named in the source: rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE, AS REQUESTED BY THE COMMISSIONER, FOR CLASS 1 WORK WITHOUT PERMIT VIOLATION #39130576L, ISSUED 11/18/2024, CONCERNING A 20'-0" X 20'-0" REAR-YARD EXCAVATION, 10'

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 421 East 114 Street, Manhattan, NY 10029

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE, AS REQUESTED BY THE COMMISSIONER, FOR CLASS 1 WORK WITHOUT PERMIT VIOLATION #39130576L, ISSUED 11/18/2024…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205436N.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205436N, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 421 East 114 Street, Manhattan, NY 10029
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 421 East 114 Street, Manhattan, NY 10029 — not just the summons number

For this property, start with certificate of correction / order noncompliance. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Certificate of Correction / order noncompliance (3 source summonses): Underlying-case research, correction paperwork and DOB compliance closeout.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.