44-37 64 Street, Queens, NY 11377 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 44-37 64 Street, Queens, NY 11377 and source-listed dates December 10, 2026, December 11, 2026, December 18, 2026. Recorded concerns include work without a permit, work contrary to approved plans, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitWork contrary to approved plansSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
44-37 64 Street, Queens, NY 11377
Borough
Queens
BIN
4053643
BBL
4023250012
Source summonses
3
Hearing dates in source
December 10, 2026, December 11, 2026, December 18, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 44-37 64 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 44-37 64 Street, Queens, NY 11377?

The uploaded record lists 3 summonses, including 039172727P (work without a permit), 039548942K (work contrary to approved plans), 035685900H (site safety / construction operations). The source-listed hearing dates: December 10, 2026, December 11, 2026, December 18, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39172727P
039172727P
8:30 AM
CLASS - 1Work without a permitPENDING
39548942K
039548942K
8:30 AM
CLASS - 1Work contrary to approved plansPENDING
35685900H
035685900H
8:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 3 recorded summonses relate at 44-37 64 Street, Queens, NY 11377

The verified property matching links 3 distinct summonses to 44-37 64 Street, Queens, NY 11377. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (1): source summons 035685900H. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039548942K. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039172727P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list January 6, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Permits and approved drawings may be common evidence, but an absent permit and departure from approved documents are different allegations.

More than one source-listed hearing date: December 10, 2026, December 11, 2026, December 18, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39172727P

Normalized ten-character lookup: 039172727P (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: structural framing.

Inspector narrative as preserved in source data — potentially incomplete

WORK WITHOUT A PERMIT. NOTED: AT THE TIME OF INSPECTION OBSERVED A PROPOSED 2.5 STORY STRUCTURE ERECTED TO 3 STORIES. NO PERMITS IN DOB RECORDS FOR AN 3 STORY STRUCTURE UPON FURTHER RESEARCH. WORK CONTRARY TO A

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
January 6, 2026
Service date
January 6, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44-37 64 Street, Queens, NY 11377

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. NOTED: AT THE TIME OF INSPECTION OBSERVED A PROPOSED 2.5 STORY STRUCTURE ERECTED TO 3 STORIES. NO PERMITS IN DOB RECORDS FOR AN 3 ST…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039172727P.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039172727P, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 44-37 64 Street, Queens, NY 11377
Summons 2 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39548942K

Normalized ten-character lookup: 039548942K (infraction 182)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop, front exposure.

Inspector narrative as preserved in source data — potentially incomplete

UPON RESEARCH OF DEPARTMENTAL RECORDS I OBSERVED THE CONTRACTOR RAISED THE ROOF AT THE FRONT OF THE BUILDING CONTRARY TO APPROVED PLANS, NON-CONFORMING WORK POSES A SEVERE THREAT OR HAZARD TO WORKERS AND/OR PUB

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
January 8, 2026
Service date
January 8, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44-37 64 Street, Queens, NY 11377

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop, front exposure. Record-specific inspection detail: Inspector text begins: “UPON RESEARCH OF DEPARTMENTAL RECORDS I OBSERVED THE CONTRACTOR RAISED THE ROOF AT THE FRONT OF THE BUILDING CONTRARY TO APPROVED PLANS, NON-CONFORMING WOR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039548942K.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • front-exposure photos showing the area alleged
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039548942K, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 44-37 64 Street, Queens, NY 11377
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 35685900H

Normalized ten-character lookup: 035685900H (infraction 209)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AS NOTED: AT TIME OF INSPECTIONS OBSERVED A 215 STORY BUILDING UNDER ACTIVE ALT, PERMIT (1)01245952 FOR FULL RENOVATION, FULL CR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
January 6, 2026
Service date
January 6, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 44-37 64 Street, Queens, NY 11377

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AS NOTED: AT TIME OF INSPECTIONS OBSERVED A 215 STORY BUILDING UNDER ACTI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035685900H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035685900H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 44-37 64 Street, Queens, NY 11377
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 44-37 64 Street, Queens, NY 11377 — not just the summons number

For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 10, 2026, December 11, 2026, December 18, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.