NYC DOB / ECB / OATH hearings · verified property resolution

44 Hudson Street, Manhattan, NY 10013 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 7 DOB/ECB/OATH summonses with 44 Hudson Street, Manhattan, NY 10013 and source-listed date December 31, 2026. Recorded concerns include work without a permit, unpermitted electrical work, work contrary to approved plans and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitUnpermitted electrical workWork contrary to approved plansElectrical safety / service equipmentUnsafe condition / maintenance

Verified premises, hearing and enforcement snapshot

Verified premises address
44 Hudson Street, Manhattan, NY 10013
Borough
Manhattan
BIN
1001564
BBL
1001440020
Source summonses
7
Hearing dates in source
December 31, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 44 HUDSON STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 44 Hudson Street, Manhattan, NY 10013?

The uploaded record lists 7 summonses, including 039208780X (work contrary to approved plans), 039208790J (work without a permit), 039208793P (unpermitted electrical work), 039208791L (unpermitted electrical work) and additional tickets. The source-listed hearing date: December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39208780X
039208780X
8:30 AM
CLASS - 2Work contrary to approved plansPENDING
39208790J
039208790J
8:30 AM
CLASS - 1Work without a permitPENDING
39208793P
039208793P
8:30 AM
CLASS - 1Unpermitted electrical workPENDING
39208791L
039208791L
9:30 AM
CLASS - 1Unpermitted electrical workPENDING
39208794R
039208794R
9:30 AM
CLASS - 1Electrical safety / service equipmentPENDING
39208792N
039208792N
10:30 AM
CLASS - 1Work without a permitPENDING
39208795Z
039208795Z
10:30 AM
CLASS - 1Unsafe condition / maintenancePENDING

How the 7 recorded summonses relate at 44 Hudson Street, Manhattan, NY 10013

The verified property matching links 7 distinct summonses to 44 Hudson Street, Manhattan, NY 10013. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Unpermitted electrical work (2): source summons 039208793P, 039208791L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work without a permit (2): source summons 039208790J, 039208792N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Electrical safety / service equipment (1): source summons 039208794R. Check this charge separately, even when its documents can be gathered with other property records.

Unsafe condition / maintenance (1): source summons 039208795Z. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039208780X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 7 summonses list October 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Permits and approved drawings may be common evidence, but an absent permit and departure from approved documents are different allegations.

Potential shared workstream: Coordinate licensed-electrical assessment, but distinguish permit history from the asserted equipment safety/maintenance defect.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39208780X

Normalized ten-character lookup: 039208780X (infraction 282)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

WORK DOES NOT CONFORM TO DEPT DWGS. SECOND FLOOR RAMP AND "EXAM" ROOM WAS NOT INSTALLED. AT FIRST FLOOR CURVED RECEPTION WALL AND SOUTH WALLS NOT INSTALLED. NO PAA ON FILE AT TIME OF INSPECTION., CONFORM WORK T

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “WORK DOES NOT CONFORM TO DEPT DWGS. SECOND FLOOR RAMP AND "EXAM" ROOM WAS NOT INSTALLED. AT FIRST FLOOR CURVED RECEPTION WALL AND SOUTH WALLS NOT INSTALLED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208780X.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208780X, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 44 Hudson Street, Manhattan, NY 10013
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39208790J

Normalized ten-character lookup: 039208790J (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area.

Inspector narrative as preserved in source data

OBSERVED NEW CAST IRON WASTE LINES BEING INSTALLED FROM CELLAR THROUGH FLOOR 5. AT FLOOR 2 WORKERS ACTIVLY INSTALLING PIPE. FLOORS 3,4,5 PILES OF OLD CAST PIPING AND NEW CAST PIPING ON FLOORS., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area. Record-specific inspection detail: Inspector text begins: “OBSERVED NEW CAST IRON WASTE LINES BEING INSTALLED FROM CELLAR THROUGH FLOOR 5. AT FLOOR 2 WORKERS ACTIVLY INSTALLING PIPE. FLOORS 3,4,5 PILES OF OLD CAST…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208790J.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208790J, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 44 Hudson Street, Manhattan, NY 10013
Summons 3 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39208793P

Normalized ten-character lookup: 039208793P (infraction 1C9)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED IN CELLAR AND FLOORS 2 AND 3 OPEN ELECTRICAL BOXES, ELECTRICAL CABLE HANGING. OPEN ENDED WIRES. AT FLOOR 5 NEW ELECTRIC SERVICE PANEL BEING INSTALLED. NO PERMIT ON FILE AT TIME OF INSPECTION. WORK APPR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED IN CELLAR AND FLOORS 2 AND 3 OPEN ELECTRICAL BOXES, ELECTRICAL CABLE HANGING. OPEN ENDED WIRES. AT FLOOR 5 NEW ELECTRIC SERVICE PANEL BEING INSTAL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208793P.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed electrician report and electrical filing history
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208793P, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 44 Hudson Street, Manhattan, NY 10013
Summons 4 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39208791L

Normalized ten-character lookup: 039208791L (infraction 1C9)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: stairs or landings.

Inspector narrative as preserved in source data

YELLOW ROMEX TEMO POWER AND LIGHT THROUGHOUT BUILDING FLOORS 3,4,5 AND STAIRS. PERMIT FOR TEMP POWER AND LIGHT UNDER JOB # M00165600 EXPIRED ON 11/01/2025., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: stairs or landings. Record-specific inspection detail: Inspector text begins: “YELLOW ROMEX TEMO POWER AND LIGHT THROUGHOUT BUILDING FLOORS 3,4,5 AND STAIRS. PERMIT FOR TEMP POWER AND LIGHT UNDER JOB # M00165600 EXPIRED ON 11/01/2025.…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208791L.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208791L, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 44 Hudson Street, Manhattan, NY 10013
Summons 5 of the source-linked property

Electrical safety / service equipment — ECB/OATH summons 39208794R

Normalized ten-character lookup: 039208794R (infraction 1D2)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: front exposure, electrical installation.

Inspector narrative as preserved in source data

OBSERVED OPEN ELECTRIC PANEL AT 2ND FLOOR. WORKER ON LADDER STANDING DIRECTLY IN FRONT. POTENTIAL FOR ELECTRIC SHOCK OR ELECTROCUTION., COMPLY WITH EC

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: front exposure, electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED OPEN ELECTRIC PANEL AT 2ND FLOOR. WORKER ON LADDER STANDING DIRECTLY IN FRONT. POTENTIAL FOR ELECTRIC SHOCK OR ELECTROCUTION., COMPLY WITH EC”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208794R.

  • Whether the cited component, clearance or unsafe condition existed as described
  • Whether the equipment met the applicable requirements and was inspected/maintained
  • Whether the notice identified the correct location and owner responsibility
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
  • Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • licensed electrician report and electrical filing history
  • electrical service and panel photographs with location
  • licensed electrician safety evaluation and invoices
  • electrical permits, inspections and test reports
  • equipment specification or maintenance and repair records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208794R, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.

Request help with electrical safety / service equipment at 44 Hudson Street, Manhattan, NY 10013
Summons 6 of the source-linked property

Work without a permit — ECB/OATH summons 39208792N

Normalized ten-character lookup: 039208792N (infraction 101)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

OBSERVED ON FLOORS 3 AND 4 OPEN FLOOR JOISTS, NEW WOOD FRAMING AT FLOOR, NEW SUBFLOORING BEING INSTALLED. FLOORS 3,4,5 OPEN CEILINGS, OPEN MECHANICAL CHASE., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED ON FLOORS 3 AND 4 OPEN FLOOR JOISTS, NEW WOOD FRAMING AT FLOOR, NEW SUBFLOORING BEING INSTALLED. FLOORS 3,4,5 OPEN CEILINGS, OPEN MECHANICAL CHASE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208792N.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208792N, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 44 Hudson Street, Manhattan, NY 10013
Summons 7 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39208795Z

Normalized ten-character lookup: 039208795Z (infraction 102)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

AT FLOOR 3 OBSERVED APPROX 100 BLACK BAGS ON FLOOR. POTENTIAL FOR OVER LOADING FLOOR. ALSO FLOORS 3,4,5 LARGE PILES OF CAST IRON PIPING. POTENTIAL FOR OVER LOADING., REPAIR AND/REPLACE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 21, 2026
Service date
October 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 44 Hudson Street, Manhattan, NY 10013

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT FLOOR 3 OBSERVED APPROX 100 BLACK BAGS ON FLOOR. POTENTIAL FOR OVER LOADING FLOOR. ALSO FLOORS 3,4,5 LARGE PILES OF CAST IRON PIPING. POTENTIAL FOR OVER…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039208795Z.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039208795Z, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 44 Hudson Street, Manhattan, NY 10013
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 44 Hudson Street, Manhattan, NY 10013 — not just the summons number

For this property, start with work without a permit and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Unpermitted electrical work (2 source summonses): Electrical-summons hearing support and licensed-electrician filing coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 31, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.