NYC DOB / ECB / OATH hearings · verified property resolution

4563-4575 Park Avenue, Bronx, NY 10458 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 4563-4575 Park Avenue, Bronx, NY 10458 and source-listed date December 4, 2026. Recorded concerns include work without a permit, unpermitted electrical work, unsafe condition / maintenance and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitUnpermitted electrical workUnsafe condition / maintenanceIllegal occupancy / certificate of occupancy

Verified premises, hearing and enforcement snapshot

Verified premises address
4563-4575 Park Avenue, Bronx, NY 10458
Borough
Bronx
BIN
2011213
BBL
2030310069
Source summonses
6
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 4563 through 4575 PARK AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 4563-4575 Park Avenue, Bronx, NY 10458?

The uploaded record lists 6 summonses, including 039204818Y (work without a permit), 039204447Y (work without a permit), 039204819X (unpermitted electrical work), 039204448X (unsafe condition / maintenance) and additional tickets. The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39204818Y
039204818Y
8:30 AM
CLASS - 1Work without a permitPENDING
39204447Y
039204447Y
9:30 AM
CLASS - 2Work without a permitPENDING
39204819X
039204819X
9:30 AM
CLASS - 1Unpermitted electrical workPENDING
39204448X
039204448X
10:30 AM
CLASS - 2Unsafe condition / maintenancePENDING
39204817M
039204817M
10:30 AM
CLASS - 2Illegal occupancy / certificate of occupancyPENDING
39204820N
039204820N
10:30 AM
CLASS - 2Work without a permitPENDING

How the 6 recorded summonses relate at 4563-4575 Park Avenue, Bronx, NY 10458

The verified property matching links 6 distinct summonses to 4563-4575 Park Avenue, Bronx, NY 10458. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Work without a permit (3): source summons 039204818Y, 039204447Y, 039204820N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Illegal occupancy / certificate of occupancy (1): source summons 039204817M. Check this charge separately, even when its documents can be gathered with other property records.

Unpermitted electrical work (1): source summons 039204819X. Check this charge separately, even when its documents can be gathered with other property records.

Unsafe condition / maintenance (1): source summons 039204448X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 16, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Shared source issue date: 4 summonses list September 18, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39204818Y

Normalized ten-character lookup: 039204818Y (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom.

Inspector narrative as preserved in source data

W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA. GAS LINE INSTALLED FOR STOVE., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 18, 2026
Service date
September 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA. GAS LI…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204818Y.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed-trade test results and equipment/permit records
  • approved unit layout and relevant lawful occupancy records
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204818Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 4563-4575 Park Avenue, Bronx, NY 10458
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39204447Y

Normalized ten-character lookup: 039204447Y (infraction 201)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, gas or boiler equipment.

Inspector narrative as preserved in source data — potentially incomplete

WORK WITHOUT A PERMIT. I OBSERVED IN THE BASEMENT OF THE PROPERTY RECENTLY INSTALLED GAS FITTINGS AND ASSOCIATED PIPING TO PROVIDE GAS SERVICE TO THREE BASEMENT APARTMENTS. THERE ARE NO PERMITS ON FILE WITH THE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 16, 2026
Service date
September 17, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. I OBSERVED IN THE BASEMENT OF THE PROPERTY RECENTLY INSTALLED GAS FITTINGS AND ASSOCIATED PIPING TO PROVIDE GAS SERVICE TO THREE BAS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204447Y.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed-trade test results and equipment/permit records
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204447Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 4563-4575 Park Avenue, Bronx, NY 10458
Summons 3 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39204819X

Normalized ten-character lookup: 039204819X (infraction 1C9)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation, apartment or dwelling unit.

Inspector narrative as preserved in source data

W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, OUTLETS, SWITCHES, BRANCH CIRCUITS., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 18, 2026
Service date
September 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS, OUTLETS, SWITCHES, BRANCH CIRCUITS., OBTAIN PERMIT”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204819X.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed electrician report and electrical filing history
  • approved unit layout and relevant lawful occupancy records
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204819X, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 4563-4575 Park Avenue, Bronx, NY 10458
Summons 4 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39204448X

Normalized ten-character lookup: 039204448X (infraction 202)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN. I OBSERVED IN THE BASEMENT OF THE PROPERTY EXCESSIVE STORAGE OF COMBUSTIBLE MATERIALS IN THE GAS METER ROOM, WHICH IS PROHIBITED BY FGC APPENDIX E.3.3. ALSO OBSERVED IN BASEMENT APARTMENT G

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 16, 2026
Service date
September 17, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN. I OBSERVED IN THE BASEMENT OF THE PROPERTY EXCESSIVE STORAGE OF COMBUSTIBLE MATERIALS IN THE GAS METER ROOM, WHICH IS PROHIBITED BY FG…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204448X.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed-trade test results and equipment/permit records
  • approved unit layout and relevant lawful occupancy records
  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204448X, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 4563-4575 Park Avenue, Bronx, NY 10458
Summons 5 of the source-linked property

Illegal occupancy / certificate of occupancy — ECB/OATH summons 39204817M

Normalized ten-character lookup: 039204817M (infraction 203)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom.

Inspector narrative as preserved in source data — potentially incomplete

CONTRARY TO DOB/OFFICIAL RECORDS (MDR # 201824): WHICH INDICATES 61 CLASS 'A' APTS - AT TIME OF INSPECTION: NEW UNLABELED BSMT APT WEST AT NORTH CREATED 62 UNITS WITH ADDL'T 3 PC BTHRM; KITCHEN WITH GAS STOVE,

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
September 18, 2026
Service date
September 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “CONTRARY TO DOB/OFFICIAL RECORDS (MDR # 201824): WHICH INDICATES 61 CLASS 'A' APTS - AT TIME OF INSPECTION: NEW UNLABELED BSMT APT WEST AT NORTH CREATED 62…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204817M.

  • Whether the cited space and alleged use match the actual premises and inspection period
  • Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
  • Whether the described occupants, partitioning or unit configuration existed at the relevant time
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
  • Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • licensed-trade test results and equipment/permit records
  • approved unit layout and relevant lawful occupancy records
  • current and historical Certificates of Occupancy or DOB occupancy records
  • approved floor plans, unit-count and building-use documentation
  • dated floor/interior photographs and credible usage records
  • lease or occupancy documents appropriately redacted
  • professional survey/architectural assessment and permit history

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204817M, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.

Request help with illegal occupancy / certificate of occupancy at 4563-4575 Park Avenue, Bronx, NY 10458
Summons 6 of the source-linked property

Work without a permit — ECB/OATH summons 39204820N

Normalized ten-character lookup: 039204820N (infraction 201)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit.

Inspector narrative as preserved in source data

W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM & 2 BDRMS., OBTAIN ALL PERMITS

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 18, 2026
Service date
September 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 4563-4575 Park Avenue, Bronx, NY 10458

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “W/O A PERMIT. NOTED: AT BSMT APT WEST AT NORTH - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM & 2 BDRMS., OBTAIN ALL PERMITS”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204820N.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • approved unit layout and relevant lawful occupancy records
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204820N, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 4563-4575 Park Avenue, Bronx, NY 10458
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 4563-4575 Park Avenue, Bronx, NY 10458 — not just the summons number

For this property, start with work without a permit and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (3 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
  • Unsafe condition / maintenance (1 source summons): Building-maintenance hearing review and documented correction closeout.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.