NYC DOB / ECB / OATH hearings · verified property resolution

468 State Street, Brooklyn, NY 11217 — Construction fall / overhead protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 468 State Street, Brooklyn, NY 11217 and source-listed date December 16, 2026. Recorded concerns include construction fall / overhead protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Construction fall / overhead protection

Verified premises, hearing and enforcement snapshot

Verified premises address
468 State Street, Brooklyn, NY 11217
Borough
Brooklyn
BIN
3000736
BBL
3001790008
Source summonses
2
Hearing dates in source
December 16, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 468 STATE STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 468 State Street, Brooklyn, NY 11217?

The uploaded record lists 2 summonses, including 039558165Y (construction fall / overhead protection), 039558166X (construction fall / overhead protection). The source-listed hearing date: December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39558165Y
039558165Y
8:30 AM
CLASS - 2Construction fall / overhead protectionPENDING
39558166X
039558166X
8:30 AM
CLASS - 1Construction fall / overhead protectionPENDING

How the 2 recorded summonses relate at 468 State Street, Brooklyn, NY 11217

The verified property matching links 2 distinct summonses to 468 State Street, Brooklyn, NY 11217. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fall / overhead protection (2): source summons 039558165Y, 039558166X. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 2 summonses list August 20, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fall / overhead protection — ECB/OATH summons 39558165Y

Normalized ten-character lookup: 039558165Y (infraction 2P3)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXP# 2 REAR LACKED REQUIRED OVERHEAD PROTECTION OVER A PATIO WITH CHAIRS BELOW I'M GOING WORK, CREATING A HAZARD TO PUBLIC/PROPERTY. STOP ALL WORK AT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P3
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 468 State Street, Brooklyn, NY 11217

Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: rear exposure or yard. Record-specific inspection detail: Inspector text begins: “AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXP# 2 REAR LACKED REQUIRED OVERHEAD PROTECTION OVER A PATIO WITH CHAIRS BELOW I'M GOING WORK…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039558165Y.

  • Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
  • Whether engineered protection drawings and installation records cover the cited area
  • Whether the cited work phase or affected neighboring area is accurately identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
  • Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • site safety plan and engineered protection details
  • dated photographs tied to the specific exposure and floor
  • guardrail, netting or overhead-cover installation and inspection records
  • contractor corrective work logs and any adjacent-property access records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039558165Y, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.

Request help with construction fall / overhead protection at 468 State Street, Brooklyn, NY 11217
Summons 2 of the source-linked property

Construction fall / overhead protection — ECB/OATH summons 39558166X

Normalized ten-character lookup: 039558166X (infraction 1P4)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXPOSURE 4 ADJACENT PROPERTY LACKED REQUIRED ROOF PROTECTION, CREATING A HAZARD TO PUBLIC AND PROPERTY. STOP ALL WORK AT EXP. 4; MAINTAIN A 10-FT SET

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P4
Issue date
August 20, 2026
Service date
August 20, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 468 State Street, Brooklyn, NY 11217

Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT INSPECTION OF A 3-STORY BUILDING CONVERTING TO 4 STORIES, EXPOSURE 4 ADJACENT PROPERTY LACKED REQUIRED ROOF PROTECTION, CREATING A HAZARD TO PUBLIC AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039558166X.

  • Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
  • Whether engineered protection drawings and installation records cover the cited area
  • Whether the cited work phase or affected neighboring area is accurately identified
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
  • Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • site safety plan and engineered protection details
  • dated photographs tied to the specific exposure and floor
  • guardrail, netting or overhead-cover installation and inspection records
  • contractor corrective work logs and any adjacent-property access records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039558166X, Building Violation LLC can scope construction fall-protection and overhead-safety hearing preparation after reviewing the actual notice and current DOB/OATH record.

Request help with construction fall / overhead protection at 468 State Street, Brooklyn, NY 11217
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 468 State Street, Brooklyn, NY 11217 — not just the summons number

For this property, start with construction fall / overhead protection. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Construction fall / overhead protection (2 source summonses): Construction fall-protection and overhead-safety hearing preparation.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.