5-30 150 Street, Queens, NY 11357 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 5-30 150 Street, Queens, NY 11357 and source-listed date December 22, 2026. Recorded concerns include sidewalk shed / scaffolding, construction fence / site protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Sidewalk shed / scaffoldingConstruction fence / site protection

Verified premises, hearing and enforcement snapshot

Verified premises address
5-30 150 Street, Queens, NY 11357
Borough
Queens
BIN
4102281
BBL
4044960032
Source summonses
3
Hearing dates in source
December 22, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 5-30 150 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 5-30 150 Street, Queens, NY 11357?

The uploaded record lists 3 summonses, including 039560605L (sidewalk shed / scaffolding), 039560606N (construction fence / site protection), 039560604J (sidewalk shed / scaffolding). The source-listed hearing date: December 22, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560605L
039560605L
8:30 AM
CLASS - 1Sidewalk shed / scaffoldingPENDING
39560606N
039560606N
9:30 AM
CLASS - 2Construction fence / site protectionPENDING
39560604J
039560604J
10:30 AM
CLASS - 1Sidewalk shed / scaffoldingPENDING

How the 3 recorded summonses relate at 5-30 150 Street, Queens, NY 11357

The verified property matching links 3 distinct summonses to 5-30 150 Street, Queens, NY 11357. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (2): source summons 039560605L, 039560604J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Construction fence / site protection (1): source summons 039560606N. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list October 15, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560605L

Normalized ten-character lookup: 039560605L (infraction 1F1)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

INSPECTION OF A PIPE SUPPORTED SCAFFOLD AROUND THE ENTIRE BUILDING EXTERIOR I OBSERVED A PUMP JACK PLATFORM SITTING ON TOP OF THE FRAMES OF THE PIPE SCAFFOLD AT THE ROOF LEVEL. THE PUMP JACK PLATFORM IS NOT COM

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F1 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 5-30 150 Street, Queens, NY 11357

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “INSPECTION OF A PIPE SUPPORTED SCAFFOLD AROUND THE ENTIRE BUILDING EXTERIOR I OBSERVED A PUMP JACK PLATFORM SITTING ON TOP OF THE FRAMES OF THE PIPE SCAFFO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560605L.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560605L, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 5-30 150 Street, Queens, NY 11357
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39560606N

Normalized ten-character lookup: 039560606N (infraction 211)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.

Inspector narrative as preserved in source data — potentially incomplete

DURING INSPECTION OF A 2 STORY SITE WITH A CONSTRUCTION FENCE IN PLACE AROUND THE FULL PERIMETER; I OBSERVED THAT PART OF THE FENCE WAS LEANING AND PARTIALLY DISLODGED, HANGING AND ON THE VERGE OF COLLAPSE. THE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 5-30 150 Street, Queens, NY 11357

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “DURING INSPECTION OF A 2 STORY SITE WITH A CONSTRUCTION FENCE IN PLACE AROUND THE FULL PERIMETER; I OBSERVED THAT PART OF THE FENCE WAS LEANING AND PARTIAL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560606N.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560606N, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 5-30 150 Street, Queens, NY 11357
Summons 3 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39560604J

Normalized ten-character lookup: 039560604J (infraction 1P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

BC3314.1 SCOPE SCAFFOLD A 2 STORY BUILDING WITH SCAFFOLDING FULLY AROUND THE EXTERIOR I OBSERVED THE DEBRIS NETTING WAS HANGING THERE WAS A PUMP JACK PLATFORM ON TOP THE FRAMES, & PLANKS EXTENDED FROM THE SCAFF

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
October 15, 2026
Service date
October 15, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 5-30 150 Street, Queens, NY 11357

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC3314.1 SCOPE SCAFFOLD A 2 STORY BUILDING WITH SCAFFOLDING FULLY AROUND THE EXTERIOR I OBSERVED THE DEBRIS NETTING WAS HANGING THERE WAS A PUMP JACK PLATF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560604J.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560604J, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 5-30 150 Street, Queens, NY 11357
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 5-30 150 Street, Queens, NY 11357 — not just the summons number

For this property, start with sidewalk shed / scaffolding and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 22, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.