Work without a permit — ECB/OATH summons 39179996P
Normalized ten-character lookup: 039179996P (infraction 201)
Source allegation and actual cited law
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: front exposure, windows.
Inspector narrative as preserved in source data
ATOI; OBSERVED THE LEFT SIDE FRONT WINDOW OF PROPERTY HAS BEEN CHANGED FROM SINGLE TO TRIPLE WITH A NEW HEADER, NO PERMIT ,NO INSPECTION HAS BEEN DONE BY DOB., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 201 — 28-105.1 WORK WITHOUT A PERMIT
- Issue date
- March 11, 2026
- Service date
- March 11, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 501 Brighton 5 Court, Brooklyn, NY 11235
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: front exposure, windows. Record-specific inspection detail: Inspector text begins: “ATOI; OBSERVED THE LEFT SIDE FRONT WINDOW OF PROPERTY HAS BEEN CHANGED FROM SINGLE TO TRIPLE WITH A NEW HEADER, NO PERMIT ,NO INSPECTION HAS BEEN DONE BY D…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039179996P.
- Whether the work identified in the summons actually took place at the cited premises
- Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
- Whether the named respondent or owner had the responsibility alleged under the cited provision
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
- Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- front-exposure photos showing the area alleged
- window photographs and approved facade or window work plans
- historical DOB NOW/BIS permits, applications, approvals and sign-offs
- approved architectural or engineering plans and amendments
- dated photographs of the exact cited work or area
- contracts, invoices and contractor or tenant work records
- permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.