53-50 61 Street, Queens, NY 11378 — Jobsite fire extinguishers and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 53-50 61 Street, Queens, NY 11378 and source-listed date December 29, 2026. Recorded concerns include jobsite fire extinguishers, sidewalk shed / scaffolding, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Jobsite fire extinguishersSidewalk shed / scaffoldingSite safety / construction operations
Verified premises, hearing and enforcement snapshot
Verified premises address
53-50 61 Street, Queens, NY 11378
Borough
Queens
BIN
4054301
BBL
4023650088
Source summonses
3
Hearing dates in source
December 29, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 53-50 61 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 53-50 61 Street, Queens, NY 11378?
The uploaded record lists 3 summonses, including 039560837K (jobsite fire extinguishers), 039560838M (sidewalk shed / scaffolding), 039560833N (site safety / construction operations). The source-listed hearing date: December 29, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 53-50 61 Street, Queens, NY 11378
The verified property matching links 3 distinct summonses to 53-50 61 Street, Queens, NY 11378. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Jobsite fire extinguishers (1): source summons 039560837K. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039560838M. Check this charge separately, even when its documents can be gathered with other property records.
Site safety / construction operations (1): source summons 039560833N. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list October 20, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Jobsite fire extinguishers — ECB/OATH summons 39560837K
The inspector alleges absent, expired, inaccessible or otherwise deficient portable fire extinguishers at a construction site. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
IT WAS OBSERVED: ACTIVE SITE CP PRESENT AT THE TIME OF INSPECTION,NOTED LACK OF FIRE EXTINGUISHERS ON SITE WHICH VIOLATES THE NEW YORK FIRE CODE AND CREATES FIRE HAZARDS IN THE WORK PLACE, AS STIPULATED IN CO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2N6
Issue date
October 20, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$625.00
Balance field in extract
$625.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 53-50 61 Street, Queens, NY 11378
Check the actual site locations, number, condition, inspection tags and accessibility of extinguishers on the inspection date. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “IT WAS OBSERVED: ACTIVE SITE CP PRESENT AT THE TIME OF INSPECTION,NOTED LACK OF FIRE EXTINGUISHERS ON SITE WHICH VIOLATES THE NEW YORK FIRE CODE AND CREATE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560837K.
Whether the cited extinguishers were present and properly inspected at the time alleged
Whether the inspector identified the correct site or phase of work
Whether contemporaneous extinguisher service or inspection records document compliance
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Supply, inspect or replace required fire extinguishers promptly and maintain accessible placement.
Retain service tags, logs and dated post-correction photos; verify whether formal DOB certification or OATH hearing response is required.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated extinguisher location photographs and inspection tags
service vendor logs, receipts and replacement invoices
site fire-protection plan and daily inspection records
original summons and photos attached by inspector
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560837K, Building Violation LLC can scope site fire-extinguisher compliance research and hearing-evidence coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: structural framing.
Inspector narrative as preserved in source data — potentially incomplete
BC3314.4.8 OBSERVED: ACTIVE SITE SUPPORTED SCAFFOLD ERECTED ON EXP 2 UPON INSPECTION NOTED MISSING GUARD RAILS, OSHA PLANKS NOT TIE DOWN, EQUIPMENT NOT TIE TO STRUCTURE CREATING HAZARDS CONDITIONS FOR WORKERS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
206 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
Issue date
October 20, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 53-50 61 Street, Queens, NY 11378
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “BC3314.4.8 OBSERVED: ACTIVE SITE SUPPORTED SCAFFOLD ERECTED ON EXP 2 UPON INSPECTION NOTED MISSING GUARD RAILS, OSHA PLANKS NOT TIE DOWN, EQUIPMENT NOT TIE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560838M.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved framing plans and structural engineer assessment
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560838M, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: cellar or basement area, roof or rooftop.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED: C JOINTS INSTALED ON ENTIRED SITE CELLAR TO ROOF UPON REQUEST FOR C JOINTS MANUFACTURER SPECIFICATIONS AND SPECIAL INSPECTION REPORT NONE WAS PROVIDED CONTRARY TO 1704.1 SECCTION 110& 28-116 . STOP I
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1F2 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 20, 2026
Service date
October 20, 2026
Source severity
CLASS - 1
Source violation type
Site Safety
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 53-50 61 Street, Queens, NY 11378
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: cellar or basement area, roof or rooftop. Record-specific inspection detail: Inspector text begins: “OBSERVED: C JOINTS INSTALED ON ENTIRED SITE CELLAR TO ROOF UPON REQUEST FOR C JOINTS MANUFACTURER SPECIFICATIONS AND SPECIAL INSPECTION REPORT NONE WAS PRO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560833N.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
dated roof photographs and any roofing/equipment permit documents
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560833N, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 53-50 61 Street, Queens, NY 11378 — not just the summons number
For this property, start with jobsite fire extinguishers and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Jobsite fire extinguishers (1 source summons): Site fire-extinguisher compliance research and hearing-evidence coordination.
Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 29, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.