NYC DOB / ECB / OATH hearings · verified property resolution

55 3 Avenue, Manhattan, NY 10003 — Unpermitted electrical work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 55 3 Avenue, Manhattan, NY 10003 and source-listed date December 17, 2026. Recorded concerns include unpermitted electrical work, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Unpermitted electrical workWork without a permit

Verified premises, hearing and enforcement snapshot

Verified premises address
55 3 Avenue, Manhattan, NY 10003
Borough
Manhattan
BIN
1006807
BBL
1004661101
Source summonses
2
Hearing dates in source
December 17, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 198 through 204 EAST 11 STREET; 55 through 63 3 AVENUE

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 55 3 Avenue, Manhattan, NY 10003?

The uploaded record lists 2 summonses, including 039142464P (unpermitted electrical work), 039142465R (work without a permit). The source-listed hearing date: December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39142464P
039142464P
8:30 AM
CLASS - 3Unpermitted electrical workPENDING
39142465R
039142465R
8:30 AM
CLASS - 2Work without a permitPENDING

How the 2 recorded summonses relate at 55 3 Avenue, Manhattan, NY 10003

The verified property matching links 2 distinct summonses to 55 3 Avenue, Manhattan, NY 10003. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Unpermitted electrical work (1): source summons 039142464P. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039142465R. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list March 21, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39142464P

Normalized ten-character lookup: 039142464P (infraction 309)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: front exposure, electrical installation, apartment or dwelling unit, structural framing.

Inspector narrative as preserved in source data — potentially incomplete

ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED ELECTRICAL HEATERS INSTALLED AT INTERIOR OF FABRIC DINING STRUCTURE OF RESTAURANT AND A/C UNIT INSTALLED AT EXTERIOR FRONT OF LITTLE RUBY'S CAFE. N

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 309 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
March 21, 2025
Service date
March 21, 2025
Source severity
CLASS - 3
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$500.00
Balance field in extract
$500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 55 3 Avenue, Manhattan, NY 10003

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: front exposure, electrical installation, apartment or dwelling unit, structural framing. Record-specific inspection detail: Inspector text begins: “ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED ELECTRICAL HEATERS INSTALLED AT INTERIOR OF FABRIC DINING STRUCTURE OF RESTAURANT AND A/C UN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039142464P.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • licensed electrician report and electrical filing history
  • approved unit layout and relevant lawful occupancy records
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039142464P, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 55 3 Avenue, Manhattan, NY 10003
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39142465R

Normalized ten-character lookup: 039142465R (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED RESTAURANT, LITTLE RUBY'S CAFE, WITH A FABRIC EXTENSION APPROXIMATELY 4'D X 29' L AT EXPOSURE 1 FOR DINING ENCLOSURE AND ADDITIONAL SEATING CAPACITY. NO PERMI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 21, 2025
Service date
March 21, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,250.00
Balance field in extract
$6,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 55 3 Avenue, Manhattan, NY 10003

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, NOTED RESTAURANT, LITTLE RUBY'S CAFE, WITH A FABRIC EXTENSION APPROXIMATELY 4'D X 29' L AT EXPOSURE 1 FOR DIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039142465R.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039142465R, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 55 3 Avenue, Manhattan, NY 10003
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 55 3 Avenue, Manhattan, NY 10003 — not just the summons number

For this property, start with unpermitted electrical work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 17, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.