NYC DOB / ECB / OATH hearings · verified property resolution

558 St Johns Place, Brooklyn, NY 11238 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 558 St Johns Place, Brooklyn, NY 11238 and source-listed date December 2, 2026. Recorded concerns include site safety / construction operations, fire escape / exit obstruction, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsFire escape / exit obstructionWork without a permit

Verified premises, hearing and enforcement snapshot

Verified premises address
558 St Johns Place, Brooklyn, NY 11238
Borough
Brooklyn
BIN
3029584
BBL
3011780024
Source summonses
3
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 558 ST JOHNS PLACE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 558 St Johns Place, Brooklyn, NY 11238?

The uploaded record lists 3 summonses, including 039559630P (site safety / construction operations), 039205356N (fire escape / exit obstruction), 039205357P (work without a permit). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559630P
039559630P
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39205356N
039205356N
9:30 AM
CLASS - 2Fire escape / exit obstructionPENDING
39205357P
039205357P
10:30 AM
CLASS - 2Work without a permitPENDING

How the 3 recorded summonses relate at 558 St Johns Place, Brooklyn, NY 11238

The verified property matching links 3 distinct summonses to 558 St Johns Place, Brooklyn, NY 11238. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Fire escape / exit obstruction (1): source summons 039205356N. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039559630P. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039205357P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 23, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: If a project altered the same route of exit, the permit review and egress correction may require one coordinated plan; establish that connection from the approved plans and cited locations.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559630P

Normalized ten-character lookup: 039559630P (infraction 2F6)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

ATOI WEATHER ADVISORY OBSERVED JERSEY BARRIERS AT EXP#1 NOT AS PER MANUFACTURES SPECIFICATION. JERSEY BARRIERS NOT CONTINUOUSLY INTERLOCKED NOT FILL WITH WATER/SAND WHICH POSES A POTENTIAL HAZARD BY ALLOWING U

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2F6 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 558 St Johns Place, Brooklyn, NY 11238

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI WEATHER ADVISORY OBSERVED JERSEY BARRIERS AT EXP#1 NOT AS PER MANUFACTURES SPECIFICATION. JERSEY BARRIERS NOT CONTINUOUSLY INTERLOCKED NOT FILL WITH W…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559630P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559630P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 558 St Johns Place, Brooklyn, NY 11238
Summons 2 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39205356N

Normalized ten-character lookup: 039205356N (infraction 2P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: cellar or basement area, stairs or landings.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED STAIR FROM GROUND FLOOR TO CELLAR NO HANDRAILING AND ALSO TWO SEWER PIPE OBSTRUCTING TREADS.; BC3301.2, COMPLY WITH CODE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 558 St Johns Place, Brooklyn, NY 11238

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: cellar or basement area, stairs or landings. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED STAIR FROM GROUND FLOOR TO CELLAR NO HANDRAILING AND ALSO TWO SEWER PIPE OBSTRUCTING TREADS.; BC3301.2, COMPLY WITH CODE”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205356N.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • stair/landing measurements and dated photos or approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205356N, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 558 St Johns Place, Brooklyn, NY 11238
Summons 3 of the source-linked property

Work without a permit — ECB/OATH summons 39205357P

Normalized ten-character lookup: 039205357P (infraction 2C2)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION ACTIVE ONGOING AFTER HOURS CONSTRUCTION WORK WHERE AHV PERMIT ONLY ISSUED FOR WORK FROM 6:00PM UNTIL 7:30PM. NO OTHER AHV PERMITS FOUND ON DOB RECORD. STOP ALL AFTER HOURS WORK, OBTAIN AFT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2C2 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 558 St Johns Place, Brooklyn, NY 11238

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION ACTIVE ONGOING AFTER HOURS CONSTRUCTION WORK WHERE AHV PERMIT ONLY ISSUED FOR WORK FROM 6:00PM UNTIL 7:30PM. NO OTHER AHV PERMITS FOU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205357P.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205357P, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 558 St Johns Place, Brooklyn, NY 11238
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 558 St Johns Place, Brooklyn, NY 11238 — not just the summons number

For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.