61-47 Wetherole Street, Queens, NY 11374 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 61-47 Wetherole Street, Queens, NY 11374 and source-listed dates December 3, 2026, December 15, 2026. Recorded concerns include work without a permit, illegal occupancy / certificate of occupancy, zoning / parking or prohibited use. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitIllegal occupancy / certificate of occupancyZoning / parking or prohibited use
Verified premises, hearing and enforcement snapshot
Verified premises address
61-47 Wetherole Street, Queens, NY 11374
Borough
Queens
BIN
4072017
BBL
4030770034
Source summonses
6
Hearing dates in source
December 3, 2026, December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 61-47 WETHEROLE STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 61-47 Wetherole Street, Queens, NY 11374?
The uploaded record lists 6 summonses, including 039140585M (work without a permit), 039140586Y (work without a permit), 039140587X (illegal occupancy / certificate of occupancy), 039140588H (work without a permit) and additional tickets. The source-listed hearing dates: December 3, 2026, December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 61-47 Wetherole Street, Queens, NY 11374
The verified property matching links 6 distinct summonses to 61-47 Wetherole Street, Queens, NY 11374. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (4): source summons 039140585M, 039140586Y, 039140588H, 039140589J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Illegal occupancy / certificate of occupancy (1): source summons 039140587X. Check this charge separately, even when its documents can be gathered with other property records.
Zoning / parking or prohibited use (1): source summons 039133312L. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 5 summonses list March 5, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 3, 2026, December 15, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work without a permit — ECB/OATH summons 39140585M
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, rear exposure or yard, kitchen or bathroom.
Inspector narrative as preserved in source data
WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL & 1ST FLOOR REAR ERECTEDFULL HEIGHT PARTITION WALLS TO CREATE BATHROOM., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 5, 2025
Service date
March 6, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, rear exposure or yard, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL & 1ST FLOOR REAR ERECTEDFULL HEIGHT PARTITION WALLS TO CREATE BATHROOM., OBTAIN ALL PERMITS”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140585M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
rear-exposure photos tied to the inspection date
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039140585M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: front exposure, construction fence or enclosure, door or exit route, garage or parking area.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED GARAGE DOOR WAS REMOVED & REPLACED WITH PLYWOOD & ENTRY DOOR. AT FRONT OF DRIVEWAY ERECTED A WOODEN FENCE WITH ENTRY DOOR APPROX. 9FT IN HEIGHT., OBT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 5, 2025
Service date
March 6, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: front exposure, construction fence or enclosure, door or exit route, garage or parking area. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION OBSERVED GARAGE DOOR WAS REMOVED & REPLACED WITH PLYWOOD & ENTRY DOOR. AT FRONT OF DRIVEWAY ERECTED A W…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140586Y.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
site-fence photos, dimensions and inspection log
door/exit photographs and approved egress plans
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039140586Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR DOB RECORDS. DOB RECORDS INDICATES 1 FAMILY WITH 1ST & 2ND FLOOR AS DWELLING, ATTIC AS STORAGE, & CELLAR AS BOILER ROOM/STORAGE. ILLEGAL OCCUPANCY NOTED: CELLAR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
March 5, 2025
Service date
March 6, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area, gas or boiler equipment, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR DOB RECORDS. DOB RECORDS INDICATES 1 FAMILY WITH 1ST & 2ND FLOOR AS DWELLING, ATTIC AS STORAGE, & CELLAR A…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140587X.
Whether the cited space and alleged use match the actual premises and inspection period
Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
Whether the described occupants, partitioning or unit configuration existed at the relevant time
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
approved unit layout and relevant lawful occupancy records
current and historical Certificates of Occupancy or DOB occupancy records
approved floor plans, unit-count and building-use documentation
dated floor/interior photographs and credible usage records
lease or occupancy documents appropriately redacted
professional survey/architectural assessment and permit history
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039140587X, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL & 1ST FLOOR REAR INSTALLED WATER & WASTE LINES 2 3PC BATHROOMS (2 SINKS, 2 SHOWERS, 2 TOILETS), & ALSO INSTALLED WATER & WASTE LINES FOR RESIDENTIAL SINK AT CELLAR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 5, 2025
Service date
March 6, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, rear exposure or yard. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL & 1ST FLOOR REAR INSTALLED WATER & WASTE LINES 2 3PC BATHROOMS (2 SINKS, 2 SHOWERS, 2 TOILETS), & ALSO INSTAL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140588H.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
rear-exposure photos tied to the inspection date
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039140588H, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, rear exposure or yard, electrical installation, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL INSTALLED ELECTRICAL WIRING FOR LIGHTS, SWITCHES, & OUTLETS THROUGH OUT. AT 1ST FLOOR REAR BATHROOM INSTALLED ELECTRICAL WIRING FOR LIGHTS, SWITCHES, & OUTLETS., OB
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 5, 2025
Service date
March 6, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,280.00
Balance field in extract
$1,280.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, rear exposure or yard, electrical installation, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. NOTED: AT CELLAR LEVEL INSTALLED ELECTRICAL WIRING FOR LIGHTS, SWITCHES, & OUTLETS THROUGH OUT. AT 1ST FLOOR REAR BATHROOM INSTALLED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039140589J.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
rear-exposure photos tied to the inspection date
licensed electrician report and electrical filing history
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039140589J, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The alleged condition concerns zoning, accessory parking or land-use restrictions. Key locations/components named in the source: front exposure, garage or parking area.
Inspector narrative as preserved in source data — potentially incomplete
VIOLATION OF PARKING REGULATION IN A RESIDENTIAL DISTRICT: AT THE TIME OF INSPECTION, OBSERVED FRONT YARD BEING USED AS PARKING PAD WITH 2 VEHICLES PARKED/STORED (GREY PICK NY PLATE #LGV5714 AND WHITE SUV NY PL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
283 — ZR 25-41 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT
Issue date
December 19, 2024
Service date
December 19, 2024
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 61-47 Wetherole Street, Queens, NY 11374
Compare the specified use or layout with the applicable zoning district, permitted occupancy, site plans and any historical approvals. Key locations/components named in the source: front exposure, garage or parking area. Record-specific inspection detail: Inspector text begins: “VIOLATION OF PARKING REGULATION IN A RESIDENTIAL DISTRICT: AT THE TIME OF INSPECTION, OBSERVED FRONT YARD BEING USED AS PARKING PAD WITH 2 VEHICLES PARKED/…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039133312L.
Whether the actual use/parking arrangement is accurately described
Whether lawful nonconforming use, approvals or documented exceptions might apply
Whether the cited location, district and legal use are correct
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Document existing conditions and current use and consult an appropriate zoning/design professional.
Consider restoration, removal, approvals or filings only after checking the applicable zoning and building records.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
parking/site-plan approvals and photos of the cited use
zoning district and site/land-use records
approved zoning plans and building occupancy documents
photos of the cited use or parking arrangement
historical approvals, application/variance documents when applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039133312L, Building Violation LLC can scope zoning/parking enforcement review and land-use filing assessment after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 61-47 Wetherole Street, Queens, NY 11374 — not just the summons number
For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (4 source summonses): Work-without-permit hearing review and legalization/removal scope.
Illegal occupancy / certificate of occupancy (1 source summons): Occupancy/illegal-conversion research, hearing preparation and design-professional coordination.
Zoning / parking or prohibited use (1 source summons): Zoning/parking enforcement review and land-use filing assessment.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 15, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.