Construction fence / site protection — ECB/OATH summons 39558149Y
Normalized ten-character lookup: 039558149Y (infraction 211)
Source allegation and actual cited law
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure.
Inspector narrative as preserved in source data
. OBSERVED CONSTRUCTION FENCE @ EXP 1 WITH EXCESSIVE GRAFFITI THROUGH FENCE, ALSO OBSERVED SEVERAL PANELS NOT PAINTED HUNTER GREEN AS REQUIRED PER BC 3307.7
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
- Issue date
- August 20, 2026
- Service date
- August 20, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,000.00
- Balance field in extract
- $1,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 6125 7 Avenue, Brooklyn, NY 11220
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “. OBSERVED CONSTRUCTION FENCE @ EXP 1 WITH EXCESSIVE GRAFFITI THROUGH FENCE, ALSO OBSERVED SEVERAL PANELS NOT PAINTED HUNTER GREEN AS REQUIRED PER BC 3307.…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039558149Y.
- Whether the cited condition existed at the exact exposure or location alleged
- Whether the protection system and permit met the requirements applicable to this site
- Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Address unsafe public access or exposed hazards immediately.
- Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- front-exposure photos showing the area alleged
- site-fence photos, dimensions and inspection log
- site safety or construction fence drawings/permits
- dated photographs showing the cited exposure and dimensions
- daily inspection logs and contractor repair tickets
- documented reinspection or sign-off where required
- property-matching review notes and the original summons image to reconcile identifiers
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.