642 Kosciuszko Street, Brooklyn, NY 11221 — Boiler / gas / plumbing compliance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 642 Kosciuszko Street, Brooklyn, NY 11221 and source-listed dates December 2, 2026, December 9, 2026. Recorded concerns include boiler / gas / plumbing compliance, work without a permit, electrical safety / service equipment and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Boiler / gas / plumbing complianceWork without a permitElectrical safety / service equipmentUnpermitted electrical work
Verified premises, hearing and enforcement snapshot
Verified premises address
642 Kosciuszko Street, Brooklyn, NY 11221
Borough
Brooklyn
BIN
3074009
BBL
3032520017
Source summonses
6
Hearing dates in source
December 2, 2026, December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 642 KOSCIUSZKO STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 642 Kosciuszko Street, Brooklyn, NY 11221?
The uploaded record lists 6 summonses, including 039205274J (electrical safety / service equipment), 039205282J (boiler / gas / plumbing compliance), 039205272X (work without a permit), 039205283L (boiler / gas / plumbing compliance) and additional tickets. The source-listed hearing dates: December 2, 2026, December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 6 recorded summonses relate at 642 Kosciuszko Street, Brooklyn, NY 11221
The verified property matching links 6 distinct summonses to 642 Kosciuszko Street, Brooklyn, NY 11221. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Boiler / gas / plumbing compliance (2): source summons 039205282J, 039205283L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Work without a permit (2): source summons 039205272X, 039206407Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Electrical safety / service equipment (1): source summons 039205274J. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039206406R. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 4 summonses list September 23, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Shared source issue date: 2 summonses list October 1, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Coordinate licensed-electrical assessment, but distinguish permit history from the asserted equipment safety/maintenance defect.
More than one source-listed hearing date: December 2, 2026, December 9, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Electrical safety / service equipment — ECB/OATH summons 39205274J
DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: rear exposure or yard, electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED STORAGE OF ITEMS AT UNSAFE DISTANCE TO ELECTRICAL METERS, AND UNSAFE AMOUNT OF GARBAGE BEING STORED IN REAR YARD, AND ITEMS BEING STORED IN HALLWAY. CONDITIONS POSES POTENTIAL SH
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: rear exposure or yard, electrical installation. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED STORAGE OF ITEMS AT UNSAFE DISTANCE TO ELECTRICAL METERS, AND UNSAFE AMOUNT OF GARBAGE BEING STORED IN REAR YARD, AND ITEMS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205274J.
Whether the cited component, clearance or unsafe condition existed as described
Whether the equipment met the applicable requirements and was inspected/maintained
Whether the notice identified the correct location and owner responsibility
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
licensed electrician report and electrical filing history
electrical service and panel photographs with location
licensed electrician safety evaluation and invoices
electrical permits, inspections and test reports
equipment specification or maintenance and repair records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205274J, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.
The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED BULGING UNSHIELDED, ALL-RUBBER FLEXIBLE COUPLINGS INSTALLED AT WASTE LINE. THIS MATERIAL IS IMPROPER FOR INSTALLATION AS IT MAY LEAK OR BURST ECB ISSUED FOR IMPROPER PLUMBING MAT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
266 — 28-301.1 FAIL TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER RE:INSTALLATION/MAI
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED BULGING UNSHIELDED, ALL-RUBBER FLEXIBLE COUPLINGS INSTALLED AT WASTE LINE. THIS MATERIAL IS IMPROPER FOR INSTALLATION AS IT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205282J.
Whether a required permit, inspection or periodic filing actually applied at that time
Whether licensed-trade repairs, test results or sign-offs already address the cited item
Whether the exact equipment and property location match the notice
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
plumbing/gas/boiler permit and inspection history
licensed contractor reports, tests and paid invoices
equipment photographs, serials or specifications
DOB/utility correspondence and accepted sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205282J, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, gas or boiler equipment.
Inspector narrative as preserved in source data
AT TIME OF INSPECTION, OBSERVED TWO NEW GAS WATER HEATERS INSTALLED IN CELLAR. NO PERMITS ON FILE FOR TIME OF INSTALLATION. ECB ISSUED FOR WORKING WITHOUT PERMIT., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED TWO NEW GAS WATER HEATERS INSTALLED IN CELLAR. NO PERMITS ON FILE FOR TIME OF INSTALLATION. ECB ISSUED FOR WORKING WITHOUT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205272X.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed-trade test results and equipment/permit records
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205272X, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED REGULAR 90 DEGREE PVC INSTALLED AT WASTE LINE INSTEAD OF SWEEP 90 DEGREE PVC. INSTALLED PIPING DOES NOT HAVE THE GRADUAL SLOPE TO ALLOW FOR SMOOTH WASTE DISCHARGE. ECB ISSUED FOR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
258 — 27-921(A), PC 107.3 (2008 CODE) & PC 107.4 (2014 CODE) FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED REGULAR 90 DEGREE PVC INSTALLED AT WASTE LINE INSTEAD OF SWEEP 90 DEGREE PVC. INSTALLED PIPING DOES NOT HAVE THE GRADUAL SL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205283L.
Whether a required permit, inspection or periodic filing actually applied at that time
Whether licensed-trade repairs, test results or sign-offs already address the cited item
Whether the exact equipment and property location match the notice
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
plumbing/gas/boiler permit and inspection history
licensed contractor reports, tests and paid invoices
equipment photographs, serials or specifications
DOB/utility correspondence and accepted sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205283L, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION, OBSERVED UNPERMITTED ELECTRICAL WORK DONE THROUGH OUT BUILDING. NO PERMITS OR FILING ON DOB NOW. CONDITIONS POSE ELECTRICAL SAFETY AND SHOCK HAZARD. ECB ISSUED FOR WORK WITHOUT ELECTRICAL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
October 1, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED UNPERMITTED ELECTRICAL WORK DONE THROUGH OUT BUILDING. NO PERMITS OR FILING ON DOB NOW. CONDITIONS POSE ELECTRICAL SAFETY A…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206406R.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206406R, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: front exposure, apartment or dwelling unit, mezzanine or loft.
Inspector narrative as preserved in source data
AT TIME OF INSPECTION, OBSERVED INSTALLED MEZZANINE AT FRONT OF APT 3L. NO FILING OR DOCUMENTS ON DOB NOW FOR ADDITIONAL SPACE CREATED. ECB ISSUED FOR CONSTRUCTION WORK WITHOUT PERMIT., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 1, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 642 Kosciuszko Street, Brooklyn, NY 11221
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: front exposure, apartment or dwelling unit, mezzanine or loft. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, OBSERVED INSTALLED MEZZANINE AT FRONT OF APT 3L. NO FILING OR DOCUMENTS ON DOB NOW FOR ADDITIONAL SPACE CREATED. ECB ISSUED FOR CONS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206407Z.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
approved unit layout and relevant lawful occupancy records
approved floor elevations and dated mezzanine/loft photos
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206407Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 642 Kosciuszko Street, Brooklyn, NY 11221 — not just the summons number
For this property, start with boiler / gas / plumbing compliance and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Boiler / gas / plumbing compliance (2 source summonses): Mechanical/plumbing violation research and licensed-trade correction coordination.
Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
Electrical safety / service equipment (1 source summons): Electrical maintenance summons analysis and licensed-trade remediation.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 2, 2026, December 9, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.