667 West 161 Street, Manhattan, NY 10032 — Fire alarm / sprinkler / suppression and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 667 West 161 Street, Manhattan, NY 10032 and source-listed dates December 3, 2026, December 17, 2026. Recorded concerns include fire alarm / sprinkler / suppression, work without a permit, unsafe condition / maintenance and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Fire alarm / sprinkler / suppressionWork without a permitUnsafe condition / maintenanceElectrical safety / service equipmentUnpermitted electrical work
Verified premises, hearing and enforcement snapshot
Verified premises address
667 West 161 Street, Manhattan, NY 10032
Borough
Manhattan
BIN
1063334
BBL
1021360160
Source summonses
5
Hearing dates in source
December 3, 2026, December 17, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 667 WEST 161 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 667 West 161 Street, Manhattan, NY 10032?
The uploaded record lists 5 summonses, including 039199434L (fire alarm / sprinkler / suppression), 039199435N (work without a permit), 039205794N (unsafe condition / maintenance), 039201457Y (electrical safety / service equipment) and additional tickets. The source-listed hearing dates: December 3, 2026, December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 667 West 161 Street, Manhattan, NY 10032
The verified property matching links 5 distinct summonses to 667 West 161 Street, Manhattan, NY 10032. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Electrical safety / service equipment (1): source summons 039201457Y. Check this charge separately, even when its documents can be gathered with other property records.
Fire alarm / sprinkler / suppression (1): source summons 039199434L. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039201458X. Check this charge separately, even when its documents can be gathered with other property records.
Unsafe condition / maintenance (1): source summons 039205794N. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039199435N. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list August 6, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Shared source issue date: 2 summonses list August 22, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Potential shared workstream: Coordinate licensed-electrical assessment, but distinguish permit history from the asserted equipment safety/maintenance defect.
More than one source-listed hearing date: December 3, 2026, December 17, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Fire alarm / sprinkler / suppression — ECB/OATH summons 39199434L
The record alleges a deficiency in fire detection, alarm, sprinkler or suppression equipment. Key locations/components named in the source: commercial space.
Inspector narrative as preserved in source data
I OBSERVED 2 COMMERCIAL DRYERS WITH NO FIRE PROTECTION SPRINKLERS WHICH IS IN VIOLATION OF BC 903.2.11.13., PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
255 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: LACK OF A SYSTE
Issue date
August 6, 2026
Service date
August 6, 2026
Source severity
CLASS - 2
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 667 West 161 Street, Manhattan, NY 10032
Identify which system, floor or occupancy is cited; check whether it was required and what installation, maintenance, testing or sign-off was missing at inspection. Key locations/components named in the source: commercial space. Record-specific inspection detail: Inspector text begins: “I OBSERVED 2 COMMERCIAL DRYERS WITH NO FIRE PROTECTION SPRINKLERS WHICH IS IN VIOLATION OF BC 903.2.11.13., PROVIDE A SYSTEM OF AUTOMATIC SPRINKLERS WHERE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039199434L.
Whether the listed system was legally required for the approved use and occupancy
Whether accepted fire-protection plans, test reports or system inspections cover the issue
Whether the inspector described the correct system, equipment and location
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Treat functional fire-safety defects as urgent and obtain qualified inspection.
Coordinate any needed FDNY/DOB permits, licensed fire-safety contractor corrections, tests and acceptance paperwork.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved commercial use/occupancy and relevant interior photos
approved fire-protection/alarm plans and permits
system inspection, service and acceptance test reports
contractor invoices and before/after dated equipment photos
FDNY or DOB notices and agency sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039199434L, Building Violation LLC can scope fire-protection summons review and licensed-contractor compliance coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: commercial space.
Inspector narrative as preserved in source data
I OBSERVED 2 COMMERCIAL DRYERS AND 3 COMMERCIAL WASHING MACHINES INSTALLED WITHOUT WORK PERMITS WHICH IS IN VIOLATION OF ADMIN CODE 28-105.1. 100% OF WORK IS COMPLETE., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 6, 2026
Service date
August 6, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 667 West 161 Street, Manhattan, NY 10032
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: commercial space. Record-specific inspection detail: Inspector text begins: “I OBSERVED 2 COMMERCIAL DRYERS AND 3 COMMERCIAL WASHING MACHINES INSTALLED WITHOUT WORK PERMITS WHICH IS IN VIOLATION OF ADMIN CODE 28-105.1. 100% OF WORK…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039199435N.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved commercial use/occupancy and relevant interior photos
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039199435N, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: apartment or dwelling unit.
Inspector narrative as preserved in source data
PARTS OF CEILLING HAS WATER DAMAGE POTENTIALLY PEICES OF SHHETROCK COULD FALL AT MULTIPLE ROOMS AT APT 6A., REPAIR AND/OR REPLACE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 28, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 667 West 161 Street, Manhattan, NY 10032
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “PARTS OF CEILLING HAS WATER DAMAGE POTENTIALLY PEICES OF SHHETROCK COULD FALL AT MULTIPLE ROOMS AT APT 6A., REPAIR AND/OR REPLACE”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205794N.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved unit layout and relevant lawful occupancy records
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205794N, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: electrical installation, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
I OBSERVED IN APT# 6H UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, OVERCURRENT PROTECTION UNDERSIZE AND USE OF THREE PRONG CORD AND RECEPTACLE CAUSING ELECTRIC STOVE FRAME TO ELECTRIFIED (NEUTRAL /GROUND BONDED TOG
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
August 22, 2026
Service date
August 22, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$800.00
Balance field in extract
$800.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 667 West 161 Street, Manhattan, NY 10032
Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “I OBSERVED IN APT# 6H UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, OVERCURRENT PROTECTION UNDERSIZE AND USE OF THREE PRONG CORD AND RECEPTACLE CAUSING ELECTRIC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201457Y.
Whether the cited component, clearance or unsafe condition existed as described
Whether the equipment met the applicable requirements and was inspected/maintained
Whether the notice identified the correct location and owner responsibility
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
approved unit layout and relevant lawful occupancy records
electrical service and panel photographs with location
licensed electrician safety evaluation and invoices
electrical permits, inspections and test reports
equipment specification or maintenance and repair records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201457Y, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation, apartment or dwelling unit, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
I OBSERVED IN APT# 6H INSTALLATION OF 100 AMP BREAKER PANEL AND GENERAL WIRING FOR STOVE AND REPLACEMENT OF RECEPTACLES IN KITCHEN AREA WITHOUT AN ELECTRICAL PERMIT ON FILE, OBTAIN PERMIT; OBTAIN ELECTRICAL PER
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
August 22, 2026
Service date
August 22, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 667 West 161 Street, Manhattan, NY 10032
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation, apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “I OBSERVED IN APT# 6H INSTALLATION OF 100 AMP BREAKER PANEL AND GENERAL WIRING FOR STOVE AND REPLACEMENT OF RECEPTACLES IN KITCHEN AREA WITHOUT AN ELECTRIC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039201458X.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
approved unit layout and relevant lawful occupancy records
approved wet-room layouts and plumbing/alteration permits
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039201458X, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 667 West 161 Street, Manhattan, NY 10032 — not just the summons number
For this property, start with fire alarm / sprinkler / suppression and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Fire alarm / sprinkler / suppression (1 source summons): Fire-protection summons review and licensed-contractor compliance coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 17, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.