67 South 6 Street, Brooklyn, NY 11249 — Certificate of Correction / order noncompliance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 67 South 6 Street, Brooklyn, NY 11249 and source-listed date December 9, 2026. Recorded concerns include certificate of correction / order noncompliance, construction fence / site protection, stop-work order / continued work and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Certificate of Correction / order noncomplianceConstruction fence / site protectionStop-work order / continued workSite safety / construction operationsSidewalk shed / scaffolding
Verified premises, hearing and enforcement snapshot
Verified premises address
67 South 6 Street, Brooklyn, NY 11249
Borough
Brooklyn
BIN
3063538
BBL
3024550027
Source summonses
5
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 67 through 69 SOUTH 6 STREET
Premises precision: Official building range; low endpoint shown. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 67 South 6 Street, Brooklyn, NY 11249?
The uploaded record lists 5 summonses, including 039560108K (certificate of correction / order noncompliance), 039560124K (construction fence / site protection), 039560147N (stop-work order / continued work), 039560119X (site safety / construction operations) and additional tickets. The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 67 South 6 Street, Brooklyn, NY 11249
The verified property matching links 5 distinct summonses to 67 South 6 Street, Brooklyn, NY 11249. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Certificate of Correction / order noncompliance (1): source summons 039560108K. Check this charge separately, even when its documents can be gathered with other property records.
Construction fence / site protection (1): source summons 039560124K. Check this charge separately, even when its documents can be gathered with other property records.
Sidewalk shed / scaffolding (1): source summons 039560126Y. Check this charge separately, even when its documents can be gathered with other property records.
Site safety / construction operations (1): source summons 039560119X. Check this charge separately, even when its documents can be gathered with other property records.
Stop-work order / continued work (1): source summons 039560147N. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 4 summonses list October 5, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Certificate of Correction / order noncompliance — ECB/OATH summons 39560108K
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TO CORRECT THE CONDITION CITED IN THE PRIOR NOV 3955276N WHICH STATES THAT CONDITION WAS NOT COMPLIED WITH.COMPLY WITH CO
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
Issue date
October 2, 2026
Service date
October 2, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 67 South 6 Street, Brooklyn, NY 11249
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER. RESPONDENT FAILED TO CORRECT THE CONDITION CITED IN THE PRIOR NOV 3955276N WHICH STATES…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560108K.
Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
Whether the prior order references the correct premises and responsible party
Whether the earlier cited condition has been corrected and what current DOB closeout record shows
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Retrieve the original violation, deadline and agency compliance requirements.
Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
underlying summons, order and deadline notice
DOB Certificate of Correction filings and acknowledgments
before/after dated photographs and signed affidavits where required
contractor or licensed-professional invoices and sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560108K, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure, air-conditioning or mechanical equipment.
Inspector narrative as preserved in source data — potentially incomplete
DURING MY INSPECTION OF AN ACTIVE CONSTRUCTION SITE AND AFTER REVIEWING THE PERMITS ON FILE. I FOUND THAT THE JOBSITE FENCE-IN-PLACE PERMIT HAS EXPIRED. ONE OATH SUMMONS WAS ISSUED. MAINTAIN THE FENCE PERMIT AC
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 67 South 6 Street, Brooklyn, NY 11249
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “DURING MY INSPECTION OF AN ACTIVE CONSTRUCTION SITE AND AFTER REVIEWING THE PERMITS ON FILE. I FOUND THAT THE JOBSITE FENCE-IN-PLACE PERMIT HAS EXPIRED. ON…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560124K.
Whether the cited condition existed at the exact exposure or location alleged
Whether the protection system and permit met the requirements applicable to this site
Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Address unsafe public access or exposed hazards immediately.
Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
site-fence photos, dimensions and inspection log
equipment photos and licensed installation/permit evidence
site safety or construction fence drawings/permits
dated photographs showing the cited exposure and dimensions
daily inspection logs and contractor repair tickets
documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560124K, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
GC SAFETY COMPLIANCE INSPECTION. I OBSERVED 2 WORKERS ON SITE PROCEEDING WITH DEMOLITION OPERATIONS BEYOND THE POSTED STOP-WORK ORDER NOTICE, WHICH WAS GIVEN ON 06/09/2026. REFERENCE COMPLAINT #3A66004. STOP AL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 67 South 6 Street, Brooklyn, NY 11249
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “GC SAFETY COMPLIANCE INSPECTION. I OBSERVED 2 WORKERS ON SITE PROCEEDING WITH DEMOLITION OPERATIONS BEYOND THE POSTED STOP-WORK ORDER NOTICE, WHICH WAS GIV…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560147N.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560147N, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: roof or rooftop, rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
BC 3309.1 AT THE TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE, DEMOLITION AT ROOF LEVEL 20' HEIGHT APPROX. NO OVERHEAD PROTECTION FOR ADJOINING PROPERTIES AT EXPOSURE# 2/3/4 AT REAR CREATING POTENTIAL SAFETY HA
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 67 South 6 Street, Brooklyn, NY 11249
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: roof or rooftop, rear exposure or yard. Record-specific inspection detail: Inspector text begins: “BC 3309.1 AT THE TIME OF INSPECTION OBSERVED: ACTIVE JOB SITE, DEMOLITION AT ROOF LEVEL 20' HEIGHT APPROX. NO OVERHEAD PROTECTION FOR ADJOINING PROPERTIES…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560119X.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
rear-exposure photos tied to the inspection date
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560119X, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: front exposure, sidewalk shed.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION A PROPOSED 4-STORY ALTERATION SITE, OBSERVED ERECTED SIDEWALK SHED AT EXP 1. DOB BIS RECORDS REVEALED PERMIT #B01399249-I1-SH, ISSUED 05/21/2026, EXPIRED 08/19/2026, AND NOT RENEWED. S
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P8
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 67 South 6 Street, Brooklyn, NY 11249
Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: front exposure, sidewalk shed. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION A PROPOSED 4-STORY ALTERATION SITE, OBSERVED ERECTED SIDEWALK SHED AT EXP 1. DOB BIS RECORDS REVEALED PERMIT #B01399249-I1-SH, IS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560126Y.
Whether the cited structure was installed, permitted or maintained as described
Whether the alleged defect existed at the stated location and date
Whether the shed was required to remain because of a separate unresolved condition
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
shed permit and contractor maintenance report
sidewalk shed/rigging permits and approved drawings
dated exposure-level photographs and inspection logs
scaffold or shed contractor maintenance and repair records
underlying facade notices, permits and DOB sign-offs where relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560126Y, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 67 South 6 Street, Brooklyn, NY 11249 — not just the summons number
For this property, start with certificate of correction / order noncompliance and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Certificate of Correction / order noncompliance (1 source summons): Underlying-case research, correction paperwork and DOB compliance closeout.
Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.