Stop-work order / continued work — ECB/OATH summons 39205996L
Normalized ten-character lookup: 039205996L (infraction 201)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: garage or parking area, structural framing.
Inspector narrative as preserved in source data
PSWO & ECB VIOLATION ISSUED FOR WORK WITHOUT PERMIT AT EXPO. 1. ATOI OBSERVED A STRUCTURAL JOISTS BEAM CONNECTING THE GARAGE AND THE ENTRANCE PORCH REMOVED WITHOUT A PERMIT ON FILE., OBTAIN ALL PERMITS
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 201 — 28-105.1 WORK WITHOUT A PERMIT
- Issue date
- September 29, 2026
- Service date
- September 29, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 69-29 59 Drive, Queens, NY 11378
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: garage or parking area, structural framing. Record-specific inspection detail: Inspector text begins: “PSWO & ECB VIOLATION ISSUED FOR WORK WITHOUT PERMIT AT EXPO. 1. ATOI OBSERVED A STRUCTURAL JOISTS BEAM CONNECTING THE GARAGE AND THE ENTRANCE PORCH REMOVED…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205996L.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- parking/site-plan approvals and photos of the cited use
- approved framing plans and structural engineer assessment
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.