Tenant protection plan / safeguards — ECB/OATH summons 39200287X
Normalized ten-character lookup: 039200287X (infraction 1P7)
Source allegation and actual cited law
The allegation concerns a missing tenant protection plan, posted notice or safeguards during construction in an occupied building. Key locations/components named in the source: stairs or landings, balcony or terrace.
Inspector narrative as preserved in source data — potentially incomplete
AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION AT RESIDENTIAL BUILDING COURTYARD AREA, WORKERS DOING BALCONY(S) STAIRCASE REPAIRS. ADDITIONALLY, OBSERVED INADEQUATE TPP, DOES NOT SUFFICIENTLY EXPLAIN THE SP
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 1P7
- Issue date
- August 12, 2026
- Service date
- August 12, 2026
- Source severity
- CLASS - 1
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $5,000.00
- Balance field in extract
- $5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 7 East 111 Street, Manhattan, NY 10029
Identify the occupied floors/units, the actual DOB filing and posting requirements, and whether the described work created an affected tenant-protection obligation. Key locations/components named in the source: stairs or landings, balcony or terrace. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION AT RESIDENTIAL BUILDING COURTYARD AREA, WORKERS DOING BALCONY(S) STAIRCASE REPAIRS. ADDITIONALLY, OBSERV…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039200287X.
- Whether the alleged work and occupancy triggered the specified tenant protection requirement
- Whether a compliant plan was filed, available and properly posted before the cited inspection
- Whether the cited site/units and posting locations were accurately documented
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Provide required tenant protections immediately and coordinate with the permitted job team.
- File or correct the tenant protection plan and notices as applicable and document posting, access and agency acknowledgment.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stair/landing measurements and dated photos or approved egress plans
- balcony/terrace photos, waterproofing or structural records
- DOB tenant protection plan and filing history
- dated photographs of required notice postings
- tenant protection inspection and daily work logs
- job plans, permit scope and evidence of occupied units
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039200287X, Building Violation LLC can scope tenant-protection-plan and occupied-building compliance review after reviewing the actual notice and current DOB/OATH record.
Request help with tenant protection plan / safeguards at 7 East 111 Street, Manhattan, NY 10029