NYC DOB / ECB / OATH hearings · verified property resolution

715 Madison Avenue, Manhattan, NY 10065 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 1 DOB/ECB/OATH summons with 715 Madison Avenue, Manhattan, NY 10065 and source-listed date December 3, 2026. Recorded concerns include stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
715 Madison Avenue, Manhattan, NY 10065
Borough
Manhattan
BIN
1085129
BBL
1013780122
Source summonses
1
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 715 MADISON AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 715 Madison Avenue, Manhattan, NY 10065?

The uploaded record lists 1 summons, including 039204769R (stop-work order / continued work). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39204769R
039204769R
9:30 AM
CLASS - 1Stop-work order / continued workPENDING

How this recorded summons relates at 715 Madison Avenue, Manhattan, NY 10065

This page documents one source-linked summons (039204769R), concerning stop-work order / continued work. There is no second December summons in this dataset to connect to it. Check the complete DOB property record separately for earlier or later allegations, open correction items or related agency orders.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39204769R

Normalized ten-character lookup: 039204769R (infraction 112)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: apartment or dwelling unit, kitchen or bathroom.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED IN APT 4R AT ABOVE PREMISES WORKERS CONTINUED TO WORK AT PLUMBING WHILE ON A PSWO ISSUED 8-24-26 NOV 039201549L. TUB AND TOILET INSTALLED WITH PLUMBING. ISSUED NOV B112 CONTINUED TO WORK CONTRA PS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
September 18, 2026
Service date
September 18, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 715 Madison Avenue, Manhattan, NY 10065

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED IN APT 4R AT ABOVE PREMISES WORKERS CONTINUED TO WORK AT PLUMBING WHILE ON A PSWO ISSUED 8-24-26 NOV 039201549L. TUB AND TOILET INSTALLED WIT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039204769R.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • approved wet-room layouts and plumbing/alteration permits
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039204769R, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 715 Madison Avenue, Manhattan, NY 10065
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 715 Madison Avenue, Manhattan, NY 10065 — not just the summons number

For this property, start with stop-work order / continued work. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summons, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.