Stop-work order / continued work — ECB/OATH summons 39183378J
Normalized ten-character lookup: 039183378J (infraction 101)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: rear exposure or yard, structural framing.
Inspector narrative as preserved in source data — potentially incomplete
ATOI,GAINED ACCESS TO THE BASEBALL FIELD AND PSWO ISSUED FOR CONSTRUCTION WORK AT REAR RIGHT SIDE OF BASEBALL FIELD WITHOUT A PERMIT. THE STRUCTURE IS APPROXIMATELY 60L X 32W X 16H, STRUCTURE BUILDING BOLTED TO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 101 — 28-105.1 WORK WITHOUT A PERMIT
- Issue date
- April 6, 2026
- Service date
- April 6, 2026
- Source severity
- CLASS - 1
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
What the alleged violation means at 73 Joyce Street, Staten Island, NY 10305
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: rear exposure or yard, structural framing. Record-specific inspection detail: Inspector text begins: “ATOI,GAINED ACCESS TO THE BASEBALL FIELD AND PSWO ISSUED FOR CONSTRUCTION WORK AT REAR RIGHT SIDE OF BASEBALL FIELD WITHOUT A PERMIT. THE STRUCTURE IS APPR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039183378J.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- rear-exposure photos tied to the inspection date
- approved framing plans and structural engineer assessment
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039183378J, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Request help with stop-work order / continued work at 73 Joyce Street, Staten Island, NY 10305