75 South 8 Street, Brooklyn, NY 11249 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 12 DOB/ECB/OATH summonses with 75 South 8 Street, Brooklyn, NY 11249 and source-listed dates December 9, 2026, December 16, 2026. Recorded concerns include stop-work order / continued work, work without a permit, unsafe condition / maintenance and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued workWork without a permitUnsafe condition / maintenanceUnpermitted electrical work

Verified premises, hearing and enforcement snapshot

Verified premises address
75 South 8 Street, Brooklyn, NY 11249
Borough
Brooklyn
BIN
3418167
BBL
3021307502
Source summonses
12
Hearing dates in source
December 9, 2026, December 16, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 75 SOUTH 8 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 75 South 8 Street, Brooklyn, NY 11249?

The uploaded record lists 12 summonses, including 035721975H (stop-work order / continued work), 035721976J (unsafe condition / maintenance), 039201142J (stop-work order / continued work), 039201345J (stop-work order / continued work) and additional tickets. The source-listed hearing dates: December 9, 2026, December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35721975H
035721975H
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
35721976J
035721976J
8:30 AM
CLASS - 1Unsafe condition / maintenancePENDING
39201142J
039201142J
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39201345J
039201345J
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39201348P
039201348P
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39201358Z
039201358Z
8:30 AM
CLASS - 1Unpermitted electrical workPENDING
39201363N
039201363N
8:30 AM
CLASS - 1Work without a permitPENDING
39201374Z
039201374Z
8:30 AM
CLASS - 2Work without a permitPENDING
39201382Z
039201382Z
8:30 AM
CLASS - 2Work without a permitPENDING
35728381M
035728381M
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39201849N
039201849N
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39202023L
039202023L
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 12 recorded summonses relate at 75 South 8 Street, Brooklyn, NY 11249

The verified property matching links 12 distinct summonses to 75 South 8 Street, Brooklyn, NY 11249. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (7): source summons 035721975H, 039201142J, 039201345J, 039201348P, 035728381M, 039201849N and others. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Work without a permit (3): source summons 039201363N, 039201374Z, 039201382Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Unpermitted electrical work (1): source summons 039201358Z. Check this charge separately, even when its documents can be gathered with other property records.

Unsafe condition / maintenance (1): source summons 035721976J. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 8 summonses list August 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Shared source issue date: 2 summonses list August 25, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Check the stop-work order and permit history together; a permit does not independently prove the order was lifted.

More than one source-listed hearing date: December 9, 2026, December 16, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 35721975H

Normalized ten-character lookup: 035721975H (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PSWO IN EFFECT ON THIS PROPERTY, HOWEVER OBSERVED CONSTRUCTION WORK IN PROGRESS ON 6TH AND 7TH FLOORS IN VIOLATION OF PSWO RELATED TO COMPLAINT #3

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PSWO IN EFFECT ON THIS PROPERTY, HOWEVER OBSERVED CONSTRUCTION WORK IN PROGRESS ON 6TH AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035721975H.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035721975H, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 2 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 35721976J

Normalized ten-character lookup: 035721976J (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED ON 6TH AND 7TH FLOOR WORK CONTINUED AND HOUSE KEEPING NOT IN EFFECT WITH MULTIPLE AREAS WITH CONSTRUCTION DEBRIS MAKING IT A FIRE AND TRIPPING HAZARDOUS CONDITION FOR ALL PERSONAL. REMEDY: CLEAN SITE A

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED ON 6TH AND 7TH FLOOR WORK CONTINUED AND HOUSE KEEPING NOT IN EFFECT WITH MULTIPLE AREAS WITH CONSTRUCTION DEBRIS MAKING IT A FIRE AND TRIPPING HAZ…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035721976J.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035721976J, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 75 South 8 Street, Brooklyn, NY 11249
Summons 3 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39201142J

Normalized ten-character lookup: 039201142J (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: roof or rooftop, structural framing.

Inspector narrative as preserved in source data

ATOI OBSERVED THE STRUCTURE ON THE ROOF BEING EXTENDED VERTICALLY 2 FLOORS ABOVE EXISTING BUILDING. WORK CONTINUES DESPITE PSWO ISSUED ON 08/12/2026., COMPLY WITH STOP WORK ORDER

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 19, 2026
Service date
August 19, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: roof or rooftop, structural framing. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED THE STRUCTURE ON THE ROOF BEING EXTENDED VERTICALLY 2 FLOORS ABOVE EXISTING BUILDING. WORK CONTINUES DESPITE PSWO ISSUED ON 08/12/2026., COMP…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201142J.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • approved framing plans and structural engineer assessment
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201142J, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 4 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39201345J

Normalized ten-character lookup: 039201345J (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

PSWO IN EFFECT ON THIS PROPERTY. HOWEVER, ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON 6TH & 7TH FLOORS, IN VIOLATION OF PSWO RELATED TO COMPLAINT #3A75657. STOP ALL CONSTRUCTION WORK IMMEDIATELY, ONLY TO MAK

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “PSWO IN EFFECT ON THIS PROPERTY. HOWEVER, ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON 6TH & 7TH FLOORS, IN VIOLATION OF PSWO RELATED TO COMPLAINT #3A756…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201345J.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201345J, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 5 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39201348P

Normalized ten-character lookup: 039201348P (infraction 1F8)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

PSWO IN EFFICT ON THIS PROPERTY. ATOI OBSERVED SWO RELATED TO COMPLAINT #3A75657 POSTING HAD BEEN REMOVED FROM WHERE IT WAS POSTED ON MAIN ENTRY DOOR OF RESIDENTIAL PORTION OF THE BUILDING. VIOLATION ISUUED. SW

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F8 — 28-207.2.5 TAMPERED WITH, REMOVED OR DEFACED A WRITTEN STOP WORK ORDER
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “PSWO IN EFFICT ON THIS PROPERTY. ATOI OBSERVED SWO RELATED TO COMPLAINT #3A75657 POSTING HAD BEEN REMOVED FROM WHERE IT WAS POSTED ON MAIN ENTRY DOOR OF RE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201348P.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201348P, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 6 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39201358Z

Normalized ten-character lookup: 039201358Z (infraction 1C9)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: roof or rooftop, balcony or terrace, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED 3 CENTRAL AC CONDENSERS INSTALLED, 1 ON 4TH-FLR BALCONY & 2 LOCATED ON ROOF, AND 9 SPLIT AC UNITS INSTALLED & DISTRIBUTED BETWEEN 4TH, 5TH FLRS AT EXPO.3 & ROOF. ALL AC UNITS, ASSOCIATED WITH THEI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: roof or rooftop, balcony or terrace, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED 3 CENTRAL AC CONDENSERS INSTALLED, 1 ON 4TH-FLR BALCONY & 2 LOCATED ON ROOF, AND 9 SPLIT AC UNITS INSTALLED & DISTRIBUTED BETWEEN 4TH, 5TH FL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201358Z.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • balcony/terrace photos, waterproofing or structural records
  • equipment photos and licensed installation/permit evidence
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201358Z, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 75 South 8 Street, Brooklyn, NY 11249
Summons 7 of the source-linked property

Work without a permit — ECB/OATH summons 39201363N

Normalized ten-character lookup: 039201363N (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop, balcony or terrace, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data

ATOI OBSERVED 3 CENTRAL AC CONDENSERS INSTALLED, ONE ON 4TH-FLR BALCONY & TWO LOCATED ON ROOF OF 6TH FLOOR. NO MICHANICAL PERMIT FOUND IN DOB RECORDS. VIOLATION ISSUED., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop, balcony or terrace, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED 3 CENTRAL AC CONDENSERS INSTALLED, ONE ON 4TH-FLR BALCONY & TWO LOCATED ON ROOF OF 6TH FLOOR. NO MICHANICAL PERMIT FOUND IN DOB RECORDS. VIOL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201363N.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • balcony/terrace photos, waterproofing or structural records
  • equipment photos and licensed installation/permit evidence
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201363N, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 75 South 8 Street, Brooklyn, NY 11249
Summons 8 of the source-linked property

Work without a permit — ECB/OATH summons 39201374Z

Normalized ten-character lookup: 039201374Z (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: rear exposure or yard, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED AT BUILDING REAR, EXPO.3, APRX 12FT X 5FT TWO MASONERY BALCONIES WITH METAL RAILINGS HAD BEEN CONSTRUCTED AND ATTACHED TO FACADE ON 4TH FLOOR. NO PERMIT ON FILE FOR THIS WORK. VIOLATION ISSUED., O

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: rear exposure or yard, exterior masonry. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED AT BUILDING REAR, EXPO.3, APRX 12FT X 5FT TWO MASONERY BALCONIES WITH METAL RAILINGS HAD BEEN CONSTRUCTED AND ATTACHED TO FACADE ON 4TH FLOOR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201374Z.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • photographs by elevation and facade professional repair reports
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201374Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 75 South 8 Street, Brooklyn, NY 11249
Summons 9 of the source-linked property

Work without a permit — ECB/OATH summons 39201382Z

Normalized ten-character lookup: 039201382Z (infraction 201)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ATOI OBSERVED HANGING SCAFFOLD INSTALLED AT EXPO.4 OF THE BUIDING. NO PERMIT ON FILE FOR SCAFFOLD INSTALLATION. VIOLATION ISSUED., OBTAIN ALL PERMITS

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
August 21, 2026
Service date
August 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED HANGING SCAFFOLD INSTALLED AT EXPO.4 OF THE BUIDING. NO PERMIT ON FILE FOR SCAFFOLD INSTALLATION. VIOLATION ISSUED., OBTAIN ALL PERMITS”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201382Z.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201382Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 75 South 8 Street, Brooklyn, NY 11249
Summons 10 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 35728381M

Normalized ten-character lookup: 035728381M (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

UNLAWFUULY CONTINUED WORK WHILE ON NOTICE OR STOP WORK ORDER. ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON ADDITION TO ROOF. WORKERS WORKING ON SUSPENDED SCAFFOLD. ALL IN VIOLATION OF PSWO ISSUED ON 8/12/2026

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 25, 2026
Service date
August 25, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “UNLAWFUULY CONTINUED WORK WHILE ON NOTICE OR STOP WORK ORDER. ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON ADDITION TO ROOF. WORKERS WORKING ON SUSPENDED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035728381M.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035728381M, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 11 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39201849N

Normalized ten-character lookup: 039201849N (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED TWO MALE WORKERS WORKING ON ROOF EXTENSION. ACTIVE STOP WORK ORDER WAS ISSUED ON 8/19/2026., COMPLY WITH STOP WORK ORDER

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 25, 2026
Service date
August 25, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED TWO MALE WORKERS WORKING ON ROOF EXTENSION. ACTIVE STOP WORK ORDER WAS ISSUED ON 8/19/2026., COMPLY WITH STOP WORK ORDER”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039201849N.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039201849N, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Summons 12 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39202023L

Normalized ten-character lookup: 039202023L (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OBSERVED SEVERAL PUMP JACK SCAFFOLDING INSTALLED ON TOP OF ROOF AT EXPOSURE 1, USING STANDARD LADDERS AS PLATFORMS. THERE IS ACTIVE STOP WORK ORDER SINCE 8/12/2026., COMPLY WITH STOP WORK

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
August 26, 2026
Service date
August 26, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 75 South 8 Street, Brooklyn, NY 11249

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED SEVERAL PUMP JACK SCAFFOLDING INSTALLED ON TOP OF ROOF AT EXPOSURE 1, USING STANDARD LADDERS AS PLATFORMS. THERE IS ACTIVE S…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039202023L.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039202023L, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 75 South 8 Street, Brooklyn, NY 11249
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 75 South 8 Street, Brooklyn, NY 11249 — not just the summons number

For this property, start with stop-work order / continued work and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (7 source summonses): Stop-work-order research, hearing support and permit/lift coordination.
  • Work without a permit (3 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Unsafe condition / maintenance (1 source summons): Building-maintenance hearing review and documented correction closeout.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 9, 2026, December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.