Stop-work order / continued work — ECB/OATH summons 39548634Z
Normalized ten-character lookup: 039548634Z (infraction 2A7)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation, windows.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION ACTIVE SITE, WHILE RESPONDING TO A COMPLAINT CONCERNING WORK CONTRARY TO STOP WORK ORDERS. I PEEP THROUGH WINDOW PANEL WHERE I VISUALLY OBSERVED AT LEAST 7 WORKERS PRESENT INSIDE OF TH
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2A7 — 28-116.1 PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITE
- Issue date
- December 31, 2025
- Service date
- December 31, 2025
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- DEFAULT
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- NO COMPLIANCE RECORDED
- Penalty field in extract
- $2,530.00
- Balance field in extract
- $2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 78 Jefferson Street, Brooklyn, NY 11206
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation, windows. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION ACTIVE SITE, WHILE RESPONDING TO A COMPLAINT CONCERNING WORK CONTRARY TO STOP WORK ORDERS. I PEEP THROUGH WINDOW PANEL WHERE I VI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039548634Z.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- licensed electrician report and electrical filing history
- window photographs and approved facade or window work plans
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039548634Z, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
Request help with stop-work order / continued work at 78 Jefferson Street, Brooklyn, NY 11206