NYC DOB / ECB / OATH hearings · verified property resolution

84-37 118 Street, Queens, NY 11415 — Boiler / gas / plumbing compliance and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 84-37 118 Street, Queens, NY 11415 and source-listed date December 8, 2026. Recorded concerns include boiler / gas / plumbing compliance, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Boiler / gas / plumbing complianceStop-work order / continued work

Verified premises, hearing and enforcement snapshot

Verified premises address
84-37 118 Street, Queens, NY 11415
Borough
Queens
BIN
4192902
BBL
4092340040
Source summonses
2
Hearing dates in source
December 8, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 84-37 118 STREET; 84-37A 118 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 84-37 118 Street, Queens, NY 11415?

The uploaded record lists 2 summonses, including 039203724Z (boiler / gas / plumbing compliance), 039203725K (stop-work order / continued work). The source-listed hearing date: December 8, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39203724Z
039203724Z
8:30 AM
CLASS - 1Boiler / gas / plumbing compliancePENDING
39203725K
039203725K
8:30 AM
CLASS - 1Stop-work order / continued workPENDING

How the 2 recorded summonses relate at 84-37 118 Street, Queens, NY 11415

The verified property matching links 2 distinct summonses to 84-37 118 Street, Queens, NY 11415. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Boiler / gas / plumbing compliance (1): source summons 039203724Z. Check this charge separately, even when its documents can be gathered with other property records.

Stop-work order / continued work (1): source summons 039203725K. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 10, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Boiler / gas / plumbing compliance — ECB/OATH summons 39203724Z

Normalized ten-character lookup: 039203724Z (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. Key locations/components named in the source: gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom.

Inspector narrative as preserved in source data — potentially incomplete

ECB VIOLATION ISSUED FOR FAILURE TO MAINTAIN BLDG APT A5. OBSERVED FIXTURES AT KITCHEN DEMO AND REMOVED INCLUDING WASTE LINE WITH NO CAPPING. THE GAS LINE IN KITCHEN IS ALSO NOT CAPPED AT TIME OF THE INSPECTION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 10, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 84-37 118 Street, Queens, NY 11415

Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. Key locations/components named in the source: gas or boiler equipment, apartment or dwelling unit, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “ECB VIOLATION ISSUED FOR FAILURE TO MAINTAIN BLDG APT A5. OBSERVED FIXTURES AT KITCHEN DEMO AND REMOVED INCLUDING WASTE LINE WITH NO CAPPING. THE GAS LINE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039203724Z.

  • Whether a required permit, inspection or periodic filing actually applied at that time
  • Whether licensed-trade repairs, test results or sign-offs already address the cited item
  • Whether the exact equipment and property location match the notice
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
  • Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed-trade test results and equipment/permit records
  • approved unit layout and relevant lawful occupancy records
  • approved wet-room layouts and plumbing/alteration permits
  • plumbing/gas/boiler permit and inspection history
  • licensed contractor reports, tests and paid invoices
  • equipment photographs, serials or specifications
  • DOB/utility correspondence and accepted sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039203724Z, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with boiler / gas / plumbing compliance at 84-37 118 Street, Queens, NY 11415
Summons 2 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39203725K

Normalized ten-character lookup: 039203725K (infraction 1C9)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation, apartment or dwelling unit.

Inspector narrative as preserved in source data — potentially incomplete

PSWO AND ECB VIO ARE ISSUED FOR ELECTRICAL WORK WITHOUT PERMIT AT APT A5. OBSERVED CEILING FIXTURES REPLACEMENT INCLUDING WIRE INSTALLATION TO THE CEILING FIXTURES IN LIVING ROOM IN PROGRESS. NO WORK PERMIT OR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 10, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 84-37 118 Street, Queens, NY 11415

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “PSWO AND ECB VIO ARE ISSUED FOR ELECTRICAL WORK WITHOUT PERMIT AT APT A5. OBSERVED CEILING FIXTURES REPLACEMENT INCLUDING WIRE INSTALLATION TO THE CEILING…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039203725K.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • approved unit layout and relevant lawful occupancy records
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039203725K, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 84-37 118 Street, Queens, NY 11415
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 84-37 118 Street, Queens, NY 11415 — not just the summons number

For this property, start with boiler / gas / plumbing compliance and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Boiler / gas / plumbing compliance (1 source summons): Mechanical/plumbing violation research and licensed-trade correction coordination.
  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 8, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.