Construction fence / site protection — ECB/OATH summons 39206404N
Normalized ten-character lookup: 039206404N (infraction 284)
Source allegation and actual cited law
The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
VIOLATION OF FRONT YARD PLANTING IN A RESIDENTIAL DISTRICT, FRONT YARD PLANTING HAS BEEN COMPLETELY REMOVED AND REPLACED WITH CONCRETE PAVERS AND BRICK FENCE ENCLOSURE TO CREATE FRONT PATIO AREA, GRASS ELIMINAT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 284 — ZR-MISC MISCELLANEOUS VIOLATIONS OF THE ZONING RESOLUTION
- Issue date
- October 1, 2026
- Service date
- October 1, 2026
- Source severity
- CLASS - 2
- Source violation type
- Zoning
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 85-19 89 Avenue, Queens, NY 11421
Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure, exterior masonry. Record-specific inspection detail: Inspector text begins: “VIOLATION OF FRONT YARD PLANTING IN A RESIDENTIAL DISTRICT, FRONT YARD PLANTING HAS BEEN COMPLETELY REMOVED AND REPLACED WITH CONCRETE PAVERS AND BRICK FEN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039206404N.
- Whether the cited condition existed at the exact exposure or location alleged
- Whether the protection system and permit met the requirements applicable to this site
- Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Address unsafe public access or exposed hazards immediately.
- Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- front-exposure photos showing the area alleged
- site-fence photos, dimensions and inspection log
- photographs by elevation and facade professional repair reports
- site safety or construction fence drawings/permits
- dated photographs showing the cited exposure and dimensions
- daily inspection logs and contractor repair tickets
- documented reinspection or sign-off where required
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039206404N, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.
Request help with construction fence / site protection at 85-19 89 Avenue, Queens, NY 11421