NYC DOB / ECB / OATH hearings · verified property resolution

86-35 77 Avenue, Queens, NY 11385 — Construction fence / site protection and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 86-35 77 Avenue, Queens, NY 11385 and source-listed date December 15, 2026. Recorded concerns include construction fence / site protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Construction fence / site protection

Verified premises, hearing and enforcement snapshot

Verified premises address
86-35 77 Avenue, Queens, NY 11385
Borough
Queens
BIN
4312148
BBL
4038100194
Source summonses
2
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 76-12 88 STREET; 86-35 77 AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 86-35 77 Avenue, Queens, NY 11385?

The uploaded record lists 2 summonses, including 039207349Y (construction fence / site protection), 039207350L (construction fence / site protection). The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39207349Y
039207349Y
9:30 AM
CLASS - 3Construction fence / site protectionPENDING
39207350L
039207350L
10:30 AM
CLASS - 2Construction fence / site protectionPENDING

How the 2 recorded summonses relate at 86-35 77 Avenue, Queens, NY 11385

The verified property matching links 2 distinct summonses to 86-35 77 Avenue, Queens, NY 11385. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fence / site protection (2): source summons 039207349Y, 039207350L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Shared source issue date: 2 summonses list October 8, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39207349Y

Normalized ten-character lookup: 039207349Y (infraction 307)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: rear exposure or yard, front exposure, construction fence or enclosure.

Inspector narrative as preserved in source data — potentially incomplete

RCA ISSUED 05/30/25 & NOT CORRECTED FOR FENCE EXCEEDS PERMITTED HEIGHT REAR FENCE IS APPROXIMATELY 6.5 FEET IN HEIGHT AND FRONT FENCE IS APPROXIMATELY 6 FEET IN HEIGHT. CODE STATES REAR FENCE NOT TO EXCEED 6 FE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 307 — 27-509,BC 3111.1 FENCE EXCEEDS PERMITTED HEIGHT
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 3
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$200.00
Balance field in extract
$200.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 86-35 77 Avenue, Queens, NY 11385

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: rear exposure or yard, front exposure, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “RCA ISSUED 05/30/25 & NOT CORRECTED FOR FENCE EXCEEDS PERMITTED HEIGHT REAR FENCE IS APPROXIMATELY 6.5 FEET IN HEIGHT AND FRONT FENCE IS APPROXIMATELY 6 FE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207349Y.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • front-exposure photos showing the area alleged
  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207349Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 86-35 77 Avenue, Queens, NY 11385
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39207350L

Normalized ten-character lookup: 039207350L (infraction 202)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure.

Inspector narrative as preserved in source data — potentially incomplete

SUMMONS SERVED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FRONT YARD PLASTIC FENCE DAMAGED AT TWO LOCATIONS, FENCE MATERIAL NOT SUPPORTED BEING TIED W/ CAUTION TAPE AND PLASTIC WRAPPING, BROKEN S

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 86-35 77 Avenue, Queens, NY 11385

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “SUMMONS SERVED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER FRONT YARD PLASTIC FENCE DAMAGED AT TWO LOCATIONS, FENCE MATERIAL NOT SUPPORTED BE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207350L.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207350L, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 86-35 77 Avenue, Queens, NY 11385
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 86-35 77 Avenue, Queens, NY 11385 — not just the summons number

For this property, start with construction fence / site protection. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Construction fence / site protection (2 source summonses): Site-safety violation response and fence/protection correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.