NYC DOB / ECB / OATH hearings · verified property resolution

872 East 51 Street, Brooklyn, NY 11203 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 872 East 51 Street, Brooklyn, NY 11203 and source-listed date December 7, 2026. Recorded concerns include site safety / construction operations, work without a permit, unpermitted electrical work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsWork without a permitUnpermitted electrical work

Verified premises, hearing and enforcement snapshot

Verified premises address
872 East 51 Street, Brooklyn, NY 11203
Borough
Brooklyn
BIN
3106255
BBL
3047810044
Source summonses
4
Hearing dates in source
December 7, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 5013 through 5023 FOSTER AVENUE; 872 EAST 51 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 872 East 51 Street, Brooklyn, NY 11203?

The uploaded record lists 4 summonses, including 039154654Y (work without a permit), 039154655X (site safety / construction operations), 039154656H (unpermitted electrical work), 039154657J (site safety / construction operations). The source-listed hearing date: December 7, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39154654Y
039154654Y
8:30 AM
CLASS - 1Work without a permitPENDING
39154655X
039154655X
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39154656H
039154656H
8:30 AM
CLASS - 1Unpermitted electrical workPENDING
39154657J
039154657J
8:30 AM
CLASS - 1Site safety / construction operationsPENDING

How the 4 recorded summonses relate at 872 East 51 Street, Brooklyn, NY 11203

The verified property matching links 4 distinct summonses to 872 East 51 Street, Brooklyn, NY 11203. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (2): source summons 039154655X, 039154657J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Unpermitted electrical work (1): source summons 039154656H. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039154654Y. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list July 23, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39154654Y

Normalized ten-character lookup: 039154654Y (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ATOI OBSERVED NEWLY FRAMED PARTITION WALLS INSTALLED IN INTERIOR OF PROPERTY AT EXPOSURE 1 80 %COMPLETION . NO PERMITS ON FILE FOR SCOPE OF WORK TAKEN PLACE., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
July 23, 2025
Service date
July 23, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 872 East 51 Street, Brooklyn, NY 11203

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED NEWLY FRAMED PARTITION WALLS INSTALLED IN INTERIOR OF PROPERTY AT EXPOSURE 1 80 %COMPLETION . NO PERMITS ON FILE FOR SCOPE OF WORK TAKEN PLAC…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039154654Y.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039154654Y, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 872 East 51 Street, Brooklyn, NY 11203
Summons 2 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39154655X

Normalized ten-character lookup: 039154655X (infraction 209)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

ATOI OBSERVED CONSTRUCTION MATERIAL ACCESSIBLE TO THE PUBLIC ON EXTERIOR 1 OF PROPERTY., SAFEGUARD PUBLIC AND PROPERTY

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
July 23, 2025
Service date
July 23, 2025
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 872 East 51 Street, Brooklyn, NY 11203

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED CONSTRUCTION MATERIAL ACCESSIBLE TO THE PUBLIC ON EXTERIOR 1 OF PROPERTY., SAFEGUARD PUBLIC AND PROPERTY”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039154655X.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039154655X, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 872 East 51 Street, Brooklyn, NY 11203
Summons 3 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39154656H

Normalized ten-character lookup: 039154656H (infraction 1C9)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data

ATOI OBSERVED ELECTRICAL BX WIRES AND OUTLETS HANGING FROM PARTITION WALL AT 10:35 AM. NO ELECTRICAL PERMIT ON FILE WITH THE DEPARTMENT FOR ALTERATION., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
July 23, 2025
Service date
July 23, 2025
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 872 East 51 Street, Brooklyn, NY 11203

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ELECTRICAL BX WIRES AND OUTLETS HANGING FROM PARTITION WALL AT 10:35 AM. NO ELECTRICAL PERMIT ON FILE WITH THE DEPARTMENT FOR ALTERATION., OB…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039154656H.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039154656H, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 872 East 51 Street, Brooklyn, NY 11203
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39154657J

Normalized ten-character lookup: 039154657J (infraction 181)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: front exposure.

Inspector narrative as preserved in source data

ATOI OBSERVED EXCESSIVE DEBRIS AND MISCELLANEOUS CONSTRUCTION MATERIAL IN FRONT OF PROPERTY AT EXPOSURE 1., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
July 23, 2025
Service date
July 23, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 872 East 51 Street, Brooklyn, NY 11203

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED EXCESSIVE DEBRIS AND MISCELLANEOUS CONSTRUCTION MATERIAL IN FRONT OF PROPERTY AT EXPOSURE 1., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039154657J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039154657J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 872 East 51 Street, Brooklyn, NY 11203
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 872 East 51 Street, Brooklyn, NY 11203 — not just the summons number

For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (2 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 7, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.