NYC DOB / ECB / OATH hearings · verified property resolution

882 Morris Avenue, Bronx, NY 10451 — Fire escape / exit obstruction and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 882 Morris Avenue, Bronx, NY 10451 and source-listed date December 4, 2026. Recorded concerns include fire escape / exit obstruction, sidewalk shed / scaffolding, elevator / hoist compliance and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Fire escape / exit obstructionSidewalk shed / scaffoldingElevator / hoist complianceRoadway / sidewalk work-zone permits

Verified premises, hearing and enforcement snapshot

Verified premises address
882 Morris Avenue, Bronx, NY 10451
Borough
Bronx
BIN
2001922
BBL
2024210006
Source summonses
4
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 882 Morris Avenue, Bronx, NY 10451?

The uploaded record lists 4 summonses, including 039559294P (fire escape / exit obstruction), 039559297K (sidewalk shed / scaffolding), 039559295R (elevator / hoist compliance), 039559296Z (roadway / sidewalk work-zone permits). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559294P
039559294P
8:30 AM
CLASS - 1Fire escape / exit obstructionPENDING
39559297K
039559297K
8:30 AM
CLASS - 1Sidewalk shed / scaffoldingPENDING
39559295R
039559295R
9:30 AM
CLASS - 1Elevator / hoist compliancePENDING
39559296Z
039559296Z
10:30 AM
CLASS - 1Roadway / sidewalk work-zone permitsPENDING

How the 4 recorded summonses relate at 882 Morris Avenue, Bronx, NY 10451

The verified property matching links 4 distinct summonses to 882 Morris Avenue, Bronx, NY 10451. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Elevator / hoist compliance (1): source summons 039559295R. Check this charge separately, even when its documents can be gathered with other property records.

Fire escape / exit obstruction (1): source summons 039559294P. Check this charge separately, even when its documents can be gathered with other property records.

Roadway / sidewalk work-zone permits (1): source summons 039559296Z. Check this charge separately, even when its documents can be gathered with other property records.

Sidewalk shed / scaffolding (1): source summons 039559297K. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list September 17, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39559294P

Normalized ten-character lookup: 039559294P (infraction 1N5)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF PROPOSED 8 STORYNB OBSERVED HOUSEKEEPING NOT MAINTAINED AS PER CODE. MULTIPLE TRIP SLIP & FALL HAZARDS DUE TO EXCESSIVE AMOUNT OF DEBRIS/ MATERIALS IN WALKWAYS AND AT POINTS OF EGRESS.

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1N5
Issue date
September 17, 2026
Service date
September 17, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 882 Morris Avenue, Bronx, NY 10451

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF PROPOSED 8 STORYNB OBSERVED HOUSEKEEPING NOT MAINTAINED AS PER CODE. MULTIPLE TRIP SLIP & FALL HAZARDS DUE TO EXCESSIVE AMOUNT OF…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559294P.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559294P, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 882 Morris Avenue, Bronx, NY 10451
Summons 2 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559297K

Normalized ten-character lookup: 039559297K (infraction 1P7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED SUPPORTED SCAFFOLDING ERECTED AROUND PERIMETER OF BUILDING NOT MAINTAINED AS PER CODE. INADEQUATE GUARDRAILS, PLANKING, NETTING, MISSING TOE BOARDS AN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
September 17, 2026
Service date
September 17, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 882 Morris Avenue, Bronx, NY 10451

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED SUPPORTED SCAFFOLDING ERECTED AROUND PERIMETER OF BUILDING NOT MAINTAINED AS PER CODE. INADEQUA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559297K.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559297K, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 882 Morris Avenue, Bronx, NY 10451
Summons 3 of the source-linked property

Elevator / hoist compliance — ECB/OATH summons 39559295R

Normalized ten-character lookup: 039559295R (infraction 115)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The allegation addresses elevators, hoists or related tests, maintenance or safety obligations. Key locations/components named in the source: roof or rooftop, elevator or lift.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED INADEQUATE GUARDRAIL SYSTEMS AT 4TH FLOOR ELEVATOR SHAFT AND ROOF LEVEL. THESE CONDITIONS EXPOSE WORKERS TO FALLS AND BODILY HARM.STOP ALL WORK MAINTA

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
September 17, 2026
Service date
September 17, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 882 Morris Avenue, Bronx, NY 10451

Identify the numbered device and exact testing, inspection, permit or safety defect cited; compare it with the equipment history. Key locations/components named in the source: roof or rooftop, elevator or lift. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED INADEQUATE GUARDRAIL SYSTEMS AT 4TH FLOOR ELEVATOR SHAFT AND ROOF LEVEL. THESE CONDITIONS EXPOS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559295R.

  • Whether the cited device and required reporting/inspection period are correct
  • Whether testing, inspection or corrections had been completed and accepted by the relevant date
  • Whether the record confuses a different device or reporting cycle
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address active safety hazards and arrange licensed elevator/hoist contractor inspection.
  • Complete applicable DOB filings, tests, repairs, permits and final sign-offs.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • device inspection and service documentation
  • device-number identification and DOB inspection history
  • elevator maintenance logs and test filings
  • licensed contractor inspection, work and correction records
  • dated photos and DOB acceptance documentation

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559295R, Building Violation LLC can scope elevator/hoist hearing response and device-record coordination after reviewing the actual notice and current DOB/OATH record.

Request help with elevator / hoist compliance at 882 Morris Avenue, Bronx, NY 10451
Summons 4 of the source-linked property

Roadway / sidewalk work-zone permits — ECB/OATH summons 39559296Z

Normalized ten-character lookup: 039559296Z (infraction 1P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The inspector identifies work-zone equipment, barriers, containers or temporary occupancy of a street or sidewalk, possibly with a missing or expired DOT permit. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED WASH OUT BIN STORED ON STREET NOT MAINTAINED AS PER CODE & DOT REGULATIONS . WASH OUT BIN WAS STORED ON STREET EXCEEDING HEIGHT OF JERSEY BARRIERS WIT

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
September 17, 2026
Service date
September 17, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 882 Morris Avenue, Bronx, NY 10451

Determine the exact street/sidewalk location, work-zone equipment, DOT occupancy permit dates and whether pedestrian protection was sufficient. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF PROPOSED 8 STORY BUILDING OBSERVED WASH OUT BIN STORED ON STREET NOT MAINTAINED AS PER CODE & DOT REGULATIONS . WASH OUT BIN WAS S…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559296Z.

  • Whether a valid permit covered the correct roadway segment, dates and equipment
  • Whether a temporary encroachment or pedestrian obstruction occurred as described
  • Whether contemporaneous permits, inspection logs or removal records contradict the allegation
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe sidewalk/roadway obstructions and secure the applicable permit or remove equipment where appropriate.
  • Coordinate contractor and DOT documentation, photographs and any DOB compliance response for the specific site condition.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • NYC DOT permits and permit effective dates
  • dated street/sidewalk photos and work-zone layout
  • barrier, dumpster or equipment placement and removal logs
  • contractor site-safety inspection and access records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559296Z, Building Violation LLC can scope roadway/sidewalk work-zone summons analysis and permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with roadway / sidewalk work-zone permits at 882 Morris Avenue, Bronx, NY 10451
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 882 Morris Avenue, Bronx, NY 10451 — not just the summons number

For this property, start with fire escape / exit obstruction and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Elevator / hoist compliance (1 source summons): Elevator/hoist hearing response and device-record coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.