Stop-work order / continued work — ECB/OATH summons 39169860R
Normalized ten-character lookup: 039169860R (infraction 2C2)
Source allegation and actual cited law
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
PARTIAL STOP WORK ORDER ISSUED FOR WORKING AFTER HOURS WITHOUT A PERMIT NOTED AT TIME OF INSPECTION WORKERS WERE JACKHAMMERING INSIDE OF COURTYARD WITHOUT A AFTER HOURS PERMT STOP ALL AFTER HOURS WORK, OBTAIN A
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2C2 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
- Issue date
- December 9, 2025
- Service date
- December 9, 2025
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- ADMIT/IN-VIO
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,280.00
- Balance field in extract
- $0.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 90-14 48 Avenue, Queens, NY 11373
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “PARTIAL STOP WORK ORDER ISSUED FOR WORKING AFTER HOURS WITHOUT A PERMIT NOTED AT TIME OF INSPECTION WORKERS WERE JACKHAMMERING INSIDE OF COURTYARD WITHOUT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039169860R.
- Whether the work observed was covered by the order
- Whether a rescission, partial lift, or approved authorization existed at the relevant time
- Whether the cited act was construction activity, safety work permitted by the agency, or a different event
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Follow the operative stop-work order immediately and avoid unapproved work.
- Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- stop-work order and posted notice photographs
- DOB permit and stop-work records including lift history
- dated work logs, contractor schedules and site photos
- approved corrective plans, L2/other DOB submission evidence where applicable
Outcome-style status in source: what to verify before acting
The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.