Work without a permit — ECB/OATH summons 39208858R
Normalized ten-character lookup: 039208858R (infraction 2C2)
Source allegation and actual cited law
DOB alleges construction, alteration, demolition or installation work without a required permit. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
OBSERVED AFTER HOUR WORK IN PROGRESS AT 9:45PM ON 10/21/2026 WITH NO AFTER HOUR HOUR VARIANCE. UNDER PERMIT# Q01431663-I1-SH., OBTAIN AFTER HOURS VARIANCE; OBTAIN AHV PERMIT.
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 2C2 — 28-105.1 WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5
- Issue date
- October 21, 2026
- Service date
- October 21, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- ADMIT/IN-VIO
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $0.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 97-11 82 Street, Queens, NY 11416
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED AFTER HOUR WORK IN PROGRESS AT 9:45PM ON 10/21/2026 WITH NO AFTER HOUR HOUR VARIANCE. UNDER PERMIT# Q01431663-I1-SH., OBTAIN AFTER HOURS VARIANCE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208858R.
- Whether the work identified in the summons actually took place at the cited premises
- Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
- Whether the named respondent or owner had the responsibility alleged under the cited provision
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
- Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- historical DOB NOW/BIS permits, applications, approvals and sign-offs
- approved architectural or engineering plans and amendments
- dated photographs of the exact cited work or area
- contracts, invoices and contractor or tenant work records
- permit or restoration evidence and final inspections
Outcome-style status in source: what to verify before acting
The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.
Need a summons-specific action plan? For 039208858R, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Request help with work without a permit at 97-11 82 Street, Queens, NY 11416