Filing, inspection or permit administration — ECB/OATH summons 39209264Y
Normalized ten-character lookup: 039209264Y (infraction 306)
Source allegation and actual cited law
The record alleges a missing, expired, incomplete or improperly documented DOB filing, permit or inspection. Key locations/components named in the source: door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
NOTED AT "SUPER NICE PIZZA" RESTAURANT ENTRY DOOR TEMPORARY STORM ENCLOSURE APPROX. 6'X4' MADE OF ALUMINUM FRAME AND BLACK CANVAS ENCLOSURE NOT REMOVED AFTER APRIL 15 AS REQUIRED BY LAW.; REMOVE ENCLOS., COMPLY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 306 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
- Issue date
- October 26, 2026
- Service date
- October 26, 2026
- Source severity
- CLASS - 3
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $500.00
- Balance field in extract
- $500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 975 Amsterdam Avenue, Manhattan, NY 10025
Identify the job number, document, inspection or filing cycle and confirm the operative due date and recorded acceptance status. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “NOTED AT "SUPER NICE PIZZA" RESTAURANT ENTRY DOOR TEMPORARY STORM ENCLOSURE APPROX. 6'X4' MADE OF ALUMINUM FRAME AND BLACK CANVAS ENCLOSURE NOT REMOVED AFT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039209264Y.
- Whether the relevant document or inspection was in fact required
- Whether it was filed, renewed or approved before the applicable deadline
- Whether the cited job, permit, premises and responsible applicant are correct
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Obtain the correct accepted agency filing or schedule a required inspection.
- Resolve rejected or incomplete submissions and obtain documentary DOB acceptance or closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- door/exit photographs and approved egress plans
- DOB job/permit history, application and renewal records
- filing confirmation, rejection/approval and payment receipts
- inspection scheduling and result records
- professional or applicant-of-record correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039209264Y, Building Violation LLC can scope DOB filing and inspection record research and closeout support after reviewing the actual notice and current DOB/OATH record.
Request help with filing, inspection or permit administration at 975 Amsterdam Avenue, Manhattan, NY 10025