976 East 29 Street, Brooklyn, NY 11210 — Stop-work order / continued work and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 976 East 29 Street, Brooklyn, NY 11210 and source-listed date December 2, 2026. Recorded concerns include stop-work order / continued work, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Stop-work order / continued workWork contrary to approved plans

Verified premises, hearing and enforcement snapshot

Verified premises address
976 East 29 Street, Brooklyn, NY 11210
Borough
Brooklyn
BIN
3206994
BBL
3075920077
Source summonses
2
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 976 EAST 29 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 976 East 29 Street, Brooklyn, NY 11210?

The uploaded record lists 2 summonses, including 039205555X (stop-work order / continued work), 039205557J (work contrary to approved plans). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39205555X
039205555X
8:30 AM
CLASS - 1Stop-work order / continued workPENDING
39205557J
039205557J
9:30 AM
CLASS - 1Work contrary to approved plansPENDING

How the 2 recorded summonses relate at 976 East 29 Street, Brooklyn, NY 11210

The verified property matching links 2 distinct summonses to 976 East 29 Street, Brooklyn, NY 11210. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Stop-work order / continued work (1): source summons 039205555X. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039205557J. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Stop-work order / continued work — ECB/OATH summons 39205555X

Normalized ten-character lookup: 039205555X (infraction 112)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: front exposure, door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

ATOI, OBSERVED TWO (2) MALE WORKERS ACTIVELY PERFORMING CONCRETE WORK ON THE EXPOSURE 2 FRONT FOUNDATION WALL WHILE AN ACTIVE S.W.O., ISSUED 08/04/2026, WAS VISIBLY POSTED ON THE FRONT DOOR. WORK WAS UNLAWFULLY

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 976 East 29 Street, Brooklyn, NY 11210

Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: front exposure, door or exit route. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED TWO (2) MALE WORKERS ACTIVELY PERFORMING CONCRETE WORK ON THE EXPOSURE 2 FRONT FOUNDATION WALL WHILE AN ACTIVE S.W.O., ISSUED 08/04/2026, WA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205555X.

  • Whether the work observed was covered by the order
  • Whether a rescission, partial lift, or approved authorization existed at the relevant time
  • Whether the cited act was construction activity, safety work permitted by the agency, or a different event
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Follow the operative stop-work order immediately and avoid unapproved work.
  • Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • door/exit photographs and approved egress plans
  • stop-work order and posted notice photographs
  • DOB permit and stop-work records including lift history
  • dated work logs, contractor schedules and site photos
  • approved corrective plans, L2/other DOB submission evidence where applicable

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205555X, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.

Request help with stop-work order / continued work at 976 East 29 Street, Brooklyn, NY 11210
Summons 2 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39205557J

Normalized ten-character lookup: 039205557J (infraction 182)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop, rear exposure or yard.

Inspector narrative as preserved in source data — potentially incomplete

ATOI, OBSERVED WORK AT JOB #B01391403-I1 NOT CONFORMING TO APPROVED PLANS: REAR YARD EXCAVATED APPROX. 8'D X 8'W WITH NEW CMU WALLS; NEW ROOF JOISTS/DECKING THOROUGH OUT; NEW 1ST/2ND-FLOOR JOISTS THOROUGH OUT;

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 976 East 29 Street, Brooklyn, NY 11210

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop, rear exposure or yard. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED WORK AT JOB #B01391403-I1 NOT CONFORMING TO APPROVED PLANS: REAR YARD EXCAVATED APPROX. 8'D X 8'W WITH NEW CMU WALLS; NEW ROOF JOISTS/DECKIN…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205557J.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • rear-exposure photos tied to the inspection date
  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039205557J, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 976 East 29 Street, Brooklyn, NY 11210
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 976 East 29 Street, Brooklyn, NY 11210 — not just the summons number

For this property, start with stop-work order / continued work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
  • Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.