976 East 29 Street, Brooklyn, NY 11210 — Stop-work order / continued work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 976 East 29 Street, Brooklyn, NY 11210 and source-listed date December 2, 2026. Recorded concerns include stop-work order / continued work, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Stop-work order / continued workWork contrary to approved plans
Verified premises, hearing and enforcement snapshot
Verified premises address
976 East 29 Street, Brooklyn, NY 11210
Borough
Brooklyn
BIN
3206994
BBL
3075920077
Source summonses
2
Hearing dates in source
December 2, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 976 EAST 29 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 976 East 29 Street, Brooklyn, NY 11210?
The uploaded record lists 2 summonses, including 039205555X (stop-work order / continued work), 039205557J (work contrary to approved plans). The source-listed hearing date: December 2, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 976 East 29 Street, Brooklyn, NY 11210
The verified property matching links 2 distinct summonses to 976 East 29 Street, Brooklyn, NY 11210. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Stop-work order / continued work (1): source summons 039205555X. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039205557J. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Stop-work order / continued work — ECB/OATH summons 39205555X
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: front exposure, door or exit route.
Inspector narrative as preserved in source data — potentially incomplete
ATOI, OBSERVED TWO (2) MALE WORKERS ACTIVELY PERFORMING CONCRETE WORK ON THE EXPOSURE 2 FRONT FOUNDATION WALL WHILE AN ACTIVE S.W.O., ISSUED 08/04/2026, WAS VISIBLY POSTED ON THE FRONT DOOR. WORK WAS UNLAWFULLY
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 976 East 29 Street, Brooklyn, NY 11210
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: front exposure, door or exit route. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED TWO (2) MALE WORKERS ACTIVELY PERFORMING CONCRETE WORK ON THE EXPOSURE 2 FRONT FOUNDATION WALL WHILE AN ACTIVE S.W.O., ISSUED 08/04/2026, WA…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205555X.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
door/exit photographs and approved egress plans
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205555X, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: roof or rooftop, rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
ATOI, OBSERVED WORK AT JOB #B01391403-I1 NOT CONFORMING TO APPROVED PLANS: REAR YARD EXCAVATED APPROX. 8'D X 8'W WITH NEW CMU WALLS; NEW ROOF JOISTS/DECKING THOROUGH OUT; NEW 1ST/2ND-FLOOR JOISTS THOROUGH OUT;
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 976 East 29 Street, Brooklyn, NY 11210
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: roof or rooftop, rear exposure or yard. Record-specific inspection detail: Inspector text begins: “ATOI, OBSERVED WORK AT JOB #B01391403-I1 NOT CONFORMING TO APPROVED PLANS: REAR YARD EXCAVATED APPROX. 8'D X 8'W WITH NEW CMU WALLS; NEW ROOF JOISTS/DECKIN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205557J.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
rear-exposure photos tied to the inspection date
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205557J, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 976 East 29 Street, Brooklyn, NY 11210 — not just the summons number
For this property, start with stop-work order / continued work and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 2, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.